BLD01-00258
| BLD-Footing | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | PART |
|
|
###-####
post holes, ok w/ verbal corrections 3/8/2001 10:58:42 AM
|
BLD00-03185
| BLD-Concrete | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 14:58:03. Contact: ###-####.
pending special inspector report 3/8/2001 10:26:48 AM
|
BLD99-01243
| BLD-Conference | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | CANC |
|
|
Contact Jim Watts @ ###-#### for access. This is for a carpentry conference.
canc. per jim 3/8/2001 10:25:38 AM
|
BLD01-00537
| BLD-Framing/Rough-in | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 415 On 3/7/2001 4:04:12 PM
need straps to tie new to existing, finish energy seal 3/8/2001 11:24:29 AM
|
BLD00-01497
| BLD-Framing/Rough-in | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 415 On 3/7/2001 4:01:49 PM
need proper truss specs, and finish fire wall, finish draft stopping, see blue crayon marks in front unit, ok to insulate unaffected areas 3/8/2001 10:31:03 AM
|
BLD00-01496
| BLD-Framing/Rough-in | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 415 On 3/7/2001 4:04:38 PM
shear not to plan 3/8/2001 10:27:15 AM
|
BLD01-00188
| BLD-Framing/Rough-in | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 415 On 3/7/2001 4:15:18 PM shear
ext. shear ok w/ exception to front entry, need eng. 3/8/2001 12:06:13 PM
|
BLD00-03205
| BLD-Final | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | NH |
|
|
Mike ###-####
|
BLD00-02420
| BLD-Conference | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PASS |
|
|
FOR CONFERENCE--- JERRY ###-#### OR ###-#### -CALL 1ST BEFORE INSP
conf. w/ Bob A on final and plan changes, bathroom, roof vents, exit signs,ADA regs., etc. 3/8/2001 4:34:55 PM
|
BLD01-00235
| BLD-Conference | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PASS |
|
|
###-#### call first to meet there
framing issues 3/8/2001 4:00:11 PM
|
BLD01-00458
| BLD-Framing/Rough-in | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PART |
|
|
###-#### call first to meet there
ok to insulate walls,will need to see drop ceiling later 3/8/2001 1:51:24 PM
|
BLD00-02420
| BLD-Conference | 3/8/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PART |
|
|
Conference on attic ventilation requirements, required ADA restroom requirements, and exit light requirements at main entrance.
|
BLD01-00537
| BLD-Framing/Rough-in | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PASS |
|
|
###-#### GILL
kitchen nook and garage pop out ok to cover, insulation ok, wip 3/8/2001 2:27:21 PM
|
BLD00-03616
| BLD-Footing | 3/7/2001 | 3/8/2001 | 3/8/2001 12:00:00 AM | P | PART |
|
|
###-####
already done 3/8/2001 1:16:47 PM
|