Inspections for the day of: Thursday, March 8, 2001.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00386 BLD-Foundation3/7/20013/8/20013/8/2001 12:00:00 AMAPART
941--4978wip--appears ok-rebar ok 3/8/2001 8:52:35 AM
BLD00-01474 BLD-Final3/7/20013/8/20013/8/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/07/2001 at 12:18:40. Contact: ###-####. C. of C. # 20123 issued. 3/8/2001 9:12:41 AM
BLD00-01472 BLD-Final3/7/20013/8/20013/8/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/07/2001 at 12:19:46. Contact: ###-####. C. of C. #20224 issued. 3/8/2001 9:33:55 AM
MEC01-00502 Rough-in3/7/20013/8/20013/8/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/07/2001 at 12:56:01. Contact: ###-####.Prior c/n items ok 3/8/2001 1:09:56 PM
BLD01-00129 BLD-Framing/Rough-in3/7/20013/8/20013/8/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/07/2001 at 15:02:15. Contact: ###-####.
BLD01-00259 BLD-Framing/Rough-in3/7/20013/8/20013/8/2001 12:00:00 AMAPASS
###-####ok to cover 3/8/2001 10:59:43 AM
BLD00-03338 BLD-Footing3/7/20013/8/20013/8/2001 12:00:00 AMAPART
###-####wip-appears ok 3/8/2001 10:23:55 AM
BLD00-02026 BLD-Framing/Rough-in3/8/20013/8/20013/8/2001 12:00:00 AMAFAIL
Scheduled by Inspector: 420 On 3/8/2001 9:42:53 AM c/n issued--need mechanical and fire r. i. prior to insulation on 3rd floor and 1st floor, north side including pool, lounge and managers quarters. 3/8/2001 12:13:26 PM
BLD00-03339 BLD-Footing3/8/20013/8/20013/8/2001 12:00:00 AMAPART
Scheduled by Inspector: 420 On 3/8/2001 10:22:46 AM wip-appears ok 3/8/2001 10:23:13 AM
BLD00-03370 BLD-Framing/Rough-in3/8/20013/8/20013/8/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/08/2001 at 10:19:17. Contact: ###-####.c/n posted--air seal package needed and manufactures repair on bci floor joist which has been damaged. 3/8/2001 1:10:46 PM
BLD00-03325 BLD-Framing/Rough-in3/8/20013/8/20013/8/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/08/2001 at 10:24:54. Contact: ###-####.C/n issued-additional nails needed on hangers at T-9 and T-38, Tji repair references a rim joist the damaged joist is not a rim, additional attention needed. 3/8/2001 2:16:28 PM
BLD01-00526 BLD-Foundation3/8/20013/8/20013/8/2001 12:00:00 AMPPASS
###-####
BLD01-00196 BLD-Energy code compliance3/7/20013/8/20013/8/2001 12:00:00 AMPPASS
###-####