Inspections for the day of: Thursday, March 8, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-00670 Pressure Test3/7/20013/8/20013/8/2001 12:00:00 AMAPASS
###-#### cell for homeowner phil
BLD01-00266 BLD-Framing/Rough-in3/7/20013/8/20013/8/2001 12:00:00 AMAPASS
###-#### MARK WANTS YOU TO CALL HIMok to insulate 3/8/2001 10:14:46 AM
BLD00-02320 BLD-Foundation3/7/20013/8/20013/8/2001 12:00:00 AMAPASS
Gene Brown ###-#### or ###-#### engineering on openning in east wall crew installed all bracing ok to cover 3/8/2001 9:40:50 AM
BLD01-00438 BLD-Foundation3/7/20013/8/20013/8/2001 12:00:00 AMANR
###-####
BLD00-03530 BLD-Wall cover3/7/20013/8/20013/8/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/07/2001 at 16:48:12. Contact: ###-####.
BLD00-03530 BLD-Wall cover3/7/20013/8/20013/8/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/07/2001 at 16:50:07. Contact: ###-####.
BLD01-00436 BLD-Foundation3/8/20013/8/20013/8/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/08/2001 at 08:40:16. Contact: ###-####.
BLD00-03612 BLD-Final3/8/20013/8/20013/8/2001 12:00:00 AMPPASS
key on top of water heater ###-####
BLD00-03703 BLD-Final3/8/20013/8/20013/8/2001 12:00:00 AMPPASS
###-#### key on top of water heater 3/8/2001 2:53:36 PM
BLD00-03702 BLD-Final3/8/20013/8/20013/8/2001 12:00:00 AMPFAIL
key on top of water heater ###-#### need elec final 3/8/2001 2:58:27 PM
BLD01-00442 BLD-Foundation3/7/20013/8/20013/8/2001 12:00:00 AMPNR
###-#### STEM WALL