Inspections for the day of: Friday, March 8, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-00623 Pressure Test3/7/20023/8/20023/8/2002 12:00:00 AMAPASS
###-####
MEC02-00676 Pressure Test3/7/20023/8/20023/8/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/07/2002 at 12:33:06. Contact: ###-####. No access...Met with Reed on site...found no key. 3/8/2002 9:37:57 AM
BLD02-00227 BLD-Framing/Rough-in3/7/20023/8/20023/8/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/07/2002 at 14:56:33. Contact: ###-####. C/N Retro HDs at S. Gar wing. OK to side. 3/8/2002 11:53:44 AM
BLD01-02419 BLD-Framing/Rough-in3/7/20023/8/20023/8/2002 12:00:00 AMAPASS
###-#### TODD
MEC02-00567 Final3/8/20023/8/20023/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/08/2002 at 06:36:18. Contact: ###-####.
BLD02-00335 BLD-Footing3/8/20023/8/20023/8/2002 12:00:00 AMPPASS
steve-- ###-####
BLD02-00403 BLD-Footing3/8/20023/8/20023/8/2002 12:00:00 AMPPASS
###-#### JERRY
BLD02-00404 BLD-Footing3/8/20023/8/20023/8/2002 12:00:00 AMPPASS
###-#### JERRY
BLD02-00399 BLD-Footing3/8/20023/8/20023/8/2002 12:00:00 AMPPASS
###-#### JERRY
MEC02-00163 Final3/8/20023/8/20023/8/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/08/2002 at 11:11:24. Contact: ###-####.
BLD02-00473 BLD-Footing3/8/20023/8/20023/8/2002 12:00:00 AMPFAIL
###-#### shawn ft Finish digging footings for porch. 3/8/2002 12:27:46 PM
BLD01-02544 BLD-Framing/Rough-in3/8/20023/8/20023/8/2002 12:00:00 AMPPASS
Added by Inspector: 316 On 3/8/2002 4:28:09 PM