PLM02-00343
| Groundwork | 3/7/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 11:45:36. Contact: ###-####. start 4 hr test on dlb cont. in the electrical area 3/8/2002 11:44:58 AM
|
PLM01-03874
| Final | 3/7/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | A | PASS |
|
|
###-#### LOCK BOX 139
|
PLM01-01236
| Final | 3/7/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | A | PASS |
|
|
hugo ###-####
|
PLM01-04250
| Final | 3/7/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | A | PART |
|
|
fn ###-#### -james rp required on fire supression system, set all equipment, temp oc ok 3/8/2002 2:49:39 PM
|
PLM02-00078
| Plumbing Rough-in | 3/7/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 15:52:48. Contact: ###-####.
|
PLM02-00539
| Water and/or Sewer | 3/8/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 3/8/2002 8:22:47 AM talked to sprinkler contractor, jim checked the tie in will look at the inside at the r/i 3/8/2002 11:44:12 AM
|
PLM02-00521
| Plumbing Rough-in | 3/8/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/08/2002 at 08:14:33. Contact: ###-####.
|
PLM02-00555
| Water and/or Sewer | 3/8/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | P | PASS |
|
|
###-#### VAUGN sewer ok water just needs to be tied into the meter when the neighbor gets their water on their meter. 3/8/2002 3:42:38 PM
|
PLM02-00556
| Plumbing Rough-in | 3/8/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | P | PASS |
|
|
r/i- ryan ###-####
|
PLM02-00343
| Groundwork | 3/8/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 330 On 3/8/2002 11:45:15 AM part gw center dlb cont branch, southern branch was damaged by laborer, north outer ok inner down a pound will reinspect monday 3/8/2002 3:32:20 PM
|
PLM02-00527
| Final | 3/8/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 330 On 3/8/2002 2:53:36 PM provide manufactures installation information on grease trap for review
|
PLM00-03202
| Final | 3/8/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | P | PASS |
|
|
john ###-#### fn
|
PLM01-03197
| Final | 3/8/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | P | PASS |
|
|
john ###-#### fn
|
PLM01-03194
| Final | 3/8/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | P | PASS |
|
|
john ###-#### fn
|
PLM02-00553
| Plumbing Rough-in | 3/8/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | P | PASS |
|
|
###-#### eric
|
PLM02-00078
| Plumbing Rough-in | 3/8/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 330 On 3/8/2002 8:21:32 AM
|