MEC02-00465
| Final | 3/7/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | A | PASS |
|
|
jack- ###-#### fn ...no card
3/8/2002 10:38:19 AM
|
MEC02-00075
| Final | 3/7/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 411 On 3/7/2002 5:11:04 PM
|
MEC02-00076
| Final | 3/7/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 411 On 3/7/2002 5:11:57 PM
|
MEC02-00077
| Final | 3/7/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 411 On 3/7/2002 5:12:51 PM
|
MEC02-00666
| Final | 3/6/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | A | FAIL |
|
|
fn for fireplace/a-1 fireplace ###-#### need specs to check venting 3/8/2002 5:14:55 PM
|
MEC02-00365
| Rough-in | 3/7/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 11:50:26. Contact: ###-####. ok to cover ceilings..check condensates on final 3/8/2002 9:50:18 AM
|
MEC02-00656
| Rough-in | 3/7/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 13:19:06. Contact: ###-####. secure f/p with side tabs 3/8/2002 5:15:45 PM
|
MEC02-00641
| Pressure Test | 3/8/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | P | PASS |
|
|
###-#### paul equipment n/r 3/8/2002 5:15:32 PM
|
MEC02-00650
| Final | 3/8/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/08/2002 at 09:32:47. Contact: ###-####.,,five mile..north of mcmillan 3/8/2002 12:03:11 PM....###-#### 3/8/2002 12:05:18 PM
|
MEC02-00685
| Pressure Test | 3/8/2002 | 3/8/2002 | 3/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/08/2002 at 10:22:21. Contact: ###-####.
|