Inspections for the day of: Friday, March 8, 2002.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02468 BLD-Framing/Rough-in3/6/20023/8/20023/8/2002 12:00:00 AMAPASS
fr insp- steve ###-####
BLD01-02468 BLD-Energy code compliance3/6/20023/8/20023/8/2002 12:00:00 AMAPASS
energy steve- ###-####
BLD01-03285 BLD-Energy code compliance3/7/20023/8/20023/8/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/07/2002 at 08:29:22. Contact: ###-####. Insulation not completed. 3/8/2002 9:12:21 AM
MEC01-03879 Final3/7/20023/8/20023/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/07/2002 at 08:48:41. Contact: ###-####.--gar door code is 8941 for access
BLD01-03188 BLD-Framing/Rough-in3/7/20023/8/20023/8/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/07/2002 at 14:44:46. Contact: ###-####. c/n issued-ok to insulate 3/8/2002 9:46:53 AM
BLD01-03280 BLD-Energy code compliance3/7/20023/8/20023/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/07/2002 at 15:18:30. Contact: ###-####.
MEC02-00226 Final3/7/20023/8/20023/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/07/2002 at 16:28:40. Contact: ###-####.
BLD01-03084 BLD-Final3/8/20023/8/20023/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/08/2002 at 07:20:33. Contact: ###-####. c. of c. #22166 issued. 3/8/2002 8:29:33 AM
BLD01-00342 BLD-Final3/8/20023/8/20023/8/2002 12:00:00 AMACANC
Scheduled by Inspector: 420 On 3/8/2002 8:56:58 AM Cancelled by inspector--wrong inspection request. 3/8/2002 8:58:08 AM
BLD02-00339 BLD-Footing3/8/20023/8/20023/8/2002 12:00:00 AMPNR
ft insp james ###-#### No one on site-board in holes. 3/8/2002 3:24:33 PM
BLD01-03285 BLD-Energy code compliance3/8/20023/8/20023/8/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/08/2002 at 09:30:09. Contact: ###-####.
BLD01-03119 BLD-Footing3/8/20023/8/20023/8/2002 12:00:00 AMPPART
###-#### MIKE wip--footing for most of house-none of garage was inspected nor footing in house where plan review redlined and refered to 2A? Notified contractor to call for additional inspections on above items. 3/8/2002 1:43:05 PM
BLD02-00298 BLD-Footing3/8/20023/8/20023/8/2002 12:00:00 AMPPART
james- ###-#### -ft wip--30% ready at time of inspection-- 3/8/2002 1:52:37 PM
BLD02-00358 BLD-Footing3/8/20023/8/20023/8/2002 12:00:00 AMPCANC
###-#### MIKE Cancelled by contractor 3/8/2002 2:28:26 PM
BLD02-00360 BLD-Footing3/8/20023/8/20023/8/2002 12:00:00 AMPPART
###-#### MIKE wip 3/8/2002 2:27:59 PM
BLD02-00406 BLD-Footing3/8/20023/8/20023/8/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/08/2002 at 07:33:13. Contact: ###-####.wip 3/8/2002 12:39:36 PM
MEC02-00026 Final3/8/20023/8/20023/8/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/08/2002 at 07:52:46. Contact: ###-####. c/n posted--condensate temination outside and shut off to range not accessible due to weight of range. 3/8/2002 2:51:08 PM