Inspections for the day of: Monday, March 8, 2004.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00686 BLD-Conference3/1/20043/8/20043/8/2004 12:00:00 AMADONE
Prior to finding ESC number, had logged in with BLD number to address bmp violations. 3/8/2004 8:16:29 AM
ESC03-00686 BMP Violation3/1/20043/8/20043/8/2004 12:00:00 AMAPART
Still no rp--Informed GC via voice mail to comply with 8-17 including rp. Will follow-up. 3/8/2004 2:47:12 PM
ESC03-00161 BMP Violation3/1/20043/8/20043/8/2004 12:00:00 AMAPASS
Items listed on prior c/notice completed. 3/8/2004 8:15:47 AM
ESC03-01032 Tracking Control3/3/20043/8/20043/8/2004 12:00:00 AMAPASS
Trackout cleaned up per prior c/notice. 3/8/2004 8:49:05 AM
ESC04-00094 BMP Violation3/3/20043/8/20043/8/2004 12:00:00 AMAPASS
ESC03-01644 Site Preparation3/3/20043/8/20043/8/2004 12:00:00 AMAPASS
ESC03-01646 BMP Violation3/4/20043/8/20043/8/2004 12:00:00 AMAPART
ESC02-00862 BMP Violation3/5/20043/8/20043/8/2004 12:00:00 AMAPASS
Items completed on prior c/notice. 3/8/2004 3:19:39 PM
ESC03-00401 Site Final3/8/20043/8/20043/8/2004 12:00:00 AMANR
Informed rp that solid waste debris needs cleaned up. 3/8/2004 11:31:47 AM
ESC03-01212 Site Preparation3/8/20043/8/20043/8/2004 12:00:00 AMAPASS
ESC03-00334 BMP Violation3/8/20043/8/20043/8/2004 12:00:00 AMAPART
Conference with rp in regards to overflow channel. RP said banks will be hydro. seed including tack. within 2-weeks. 3/8/2004 1:25:38 PM
ESC04-00080 Site Preparation3/8/20043/8/20043/8/2004 12:00:00 AMPPART
Informed rp to have full size drawing on site. D.I. protected ok, need to sweep street at the end of day. Will follow up. 3/8/2004 2:22:30 PM