Inspections for the day of: Tuesday, March 8, 2005.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-03027 BLD-Conference3/7/20053/8/20053/8/2005 12:00:00 AMACANC
Terry; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD04-02698 BLD-Footing3/7/20053/8/20053/8/2005 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 3/7/2005 at 9:10:15 AM. Contact: ###-####. Pool OK pending special insp tests and approvals. 3/8/2005 1:45:25 PM
BLD04-02470 BLD-Framing/Rough-in3/7/20053/8/20053/8/2005 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 3/7/2005 at 9:10:43 AM. Contact: ###-####. Shear wall foundations poured (for Main BLDG) ....Need special insp reports or approval from Engineer of record. Framing OK for 3 small offices located at West end. 3/8/2005 1:44:06 PM
BLD05-00061 BLD-Framing/Rough-in3/7/20053/8/20053/8/2005 12:00:00 AMPPASS
darrin - Note; ceiling please call 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Grid. 3/8/2005 2:25:29 PM
BLD04-02338 BLD-Final3/8/20053/8/20053/8/2005 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 3/8/2005 at 7:59:37 AM. Contact: ###-####. Left note...."install handrail then recall for final" 3/8/2005 2:25:09 PM
BLD04-02971 BLD-Framing/Rough-in3/8/20053/8/20053/8/2005 12:00:00 AMPFAIL
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N Eng to approve Simpson LBV316 joist hangers with 8 nails only ..... Complete shear walls and recall. Check sill fastening (8" oc) 3/8/2005 4:22:18 PM
BLD04-01267 BLD-Energy code compliance3/8/20053/8/20053/8/2005 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 3/8/2005 at 9:46:53 AM.
BLD04-01267 BLD-Wall cover3/8/20053/8/20053/8/2005 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 3/8/2005 at 9:47:15 AM.
MEC05-00626 Rough-in3/8/20053/8/20053/8/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/8/2005 at 10:56:51 AM. Contact: ###-####.
MEC05-00626 Pressure Test3/8/20053/8/20053/8/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/8/2005 at 10:57:08 AM. Contact: ###-####.