FIR05-00425
| INSP-Sprinkler Rough-in/Hydro | 3/7/2006 | 3/8/2006 | 3/9/2006 12:07:16 PM | P | PART |
|
|
Acceptance test for the fire pump is partially completed, need to verify controller supervisory conditions including overspeed, overtemp, battery charger failure, low fuel, engine trouble, items on review note 31, replace casing drain line with non-corrosive pipe, replace broken controller stop button, install valving to the auxillary tank, lock fuel line valve open, supply performance flow charts for verification, still need to perform the tank suction test, churn psi is above the working pressure limits of the system. Flow test, starts/stops, controller settings, run time, battery switching, rpm, prv have been tested.
|
BLD05-03250
| FIRE-Final Inspection | 3/8/2006 | 3/8/2006 | 3/9/2006 11:10:43 AM | P | PASS |
|
|
Life safety is acceptable.
|
BLD05-03249
| FIRE-Final Inspection | 3/8/2006 | 3/8/2006 | 3/9/2006 11:09:30 AM | P | PASS |
|
|
Life safety is satisfactory, inspection passed.
|
BLD05-03248
| FIRE-Final Inspection | 3/8/2006 | 3/8/2006 | 3/9/2006 11:08:27 AM | P | PASS |
|
|
Life safety passed inspection.
|
FIR05-00425
| INSP-Sprinkler Rough-in/Hydro | 3/6/2006 | 3/8/2006 | 3/9/2006 9:32:05 AM | A | FAIL |
|
|
Standpipe flow test performed today did not include all required points of flow for testing approval (only the northwest stair tower at parking garage level 4 was tested).
|
FIR05-00192
| INSP-Final Inspection | 3/2/2006 | 3/8/2006 | 3/9/2006 9:02:37 AM | P | FAIL |
|
|
Provide access to "Moxie Java" tenant space for EOL test and verification of notification in the work room, replace non-functional a/v in the "Varsity Grill" and test EOL, one strobe in the ground level airport operation 1 maintenance room is blocked by adjacent cabinets, tested performance and audibility of notification in the ground and second levels, tested detectors at the WON and fire doors for release.
|
FIR05-00193
| INSP-Final Inspection | 3/2/2006 | 3/8/2006 | 3/8/2006 12:06:06 PM | A | DEFR |
|
|
Robert; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Inspection to be completed early am on 3/9 as discussed.
|