ELE06-03837
| Electrical Rough-In | 3/7/2007 | 3/8/2007 | 3/8/2007 3:08:15 PM | P | PART |
|
|
Phone #: ###-#### office area ok
|
ELE07-00378
| Electrical Rough-In | 3/8/2007 | 3/8/2007 | 3/8/2007 2:43:25 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 3/8/2007 at 7:16:25 AM. Contact: ###-####. ceilings ok to fireproof.
|
ELE07-00510
| Electrical Rough-In | 3/7/2007 | 3/8/2007 | 3/8/2007 1:57:15 PM | P | PART |
|
|
this is for underfloor inspection, any questions please call Jose Ochoa Phone #: ###-#### x0000 under floor ANOP
|
ELE07-00178
| Conference | 3/8/2007 | 3/8/2007 | 3/8/2007 1:31:50 PM | P | PART |
|
|
ted; Phone #: ###-#### Internet Inspection Request from: Victoria Beall talked about show windows and clearance for panel
|
ELE06-01995
| Electrical Rough-In | 3/8/2007 | 3/8/2007 | 3/8/2007 12:49:47 PM | P | PART |
|
|
Wes; Phone #: ###-#### Internet Inspection Request from: Stacie Backus had conf about shell and core and T/i permits
|
ELE07-00616
| Electrical Rough-In | 3/8/2007 | 3/8/2007 | 3/8/2007 10:47:02 AM | P | CANC |
|
|
please call when before heading that way so I can meet you there Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
|
ELE07-00766
| Electrical Rough-In | 3/7/2007 | 3/8/2007 | 3/8/2007 10:04:50 AM | A | PART |
|
|
ron - bonding on grid for pool and spa; Phone #: ###-#### Internet Inspection Request from: Victoria Beall partial bonding ok
|
ELE07-00463
| Electrical Rough-In | 3/7/2007 | 3/8/2007 | 3/8/2007 9:36:28 AM | A | PART |
|
|
inspect pvc underground, under new slab. thanks! call Dave Tolan Phone #: ###-#### ANOP
|
ELE07-00765
| Electrical Rough-In | 3/7/2007 | 3/8/2007 | 3/8/2007 9:17:36 AM | A | PASS |
|
|
jason - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
ELE07-00725
| Permanent Service | 3/7/2007 | 3/8/2007 | 3/8/2007 8:52:26 AM | A | PART |
|
|
This is a permanent service inspection. The garage door should be open, no one will be home please call Todd Hall @ ###-#### upon doing the inspection Phone #:###-#### P/s U/G R Ok for power water ground and bonding not done yet musr check on final and bush to be removed.
|
ELE06-03679
| Electrical Rough-In | 3/7/2007 | 3/8/2007 | 3/8/2007 8:24:55 AM | A | CANC |
|
|
Any way to make this one the 1st inspection of the day? ;0) Call 10 minutes early to meet in main hospital lobby. Phone #: ###-#### mark called not ready
|