Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00686 DOC - Permit Finaled3/8/20103/8/20103/8/2010 3:42:59 PMPPASS
ESC10-00166 Site Preparation3/8/20103/8/20103/8/2010 3:42:22 PM NR
No activity has occured yet.
ESC09-00377 Tracking Control3/5/20103/8/20103/8/2010 3:42:04 PMPPART
Actively sweeping up all of the hard surfaces.
ESC08-00629 General Inspection3/8/20103/8/20103/8/2010 2:39:51 PM DONE
ESC09-00021 BMP Violation3/5/20103/8/20103/8/2010 2:10:48 PMAFAIL
Correction Notice:
Per the pervious inspection No issues were taken care of Please refer to pervious inspection for violations. Will Re-inspect on 3/10/10AM.
ESC10-00044 Random Inspection3/8/20103/8/20103/8/2010 11:20:59 AMPPASS
ESC10-00013 Site Preparation3/2/20103/8/20103/8/2010 10:04:05 AMANR
ESC09-00812 BMP Violation3/5/20103/8/20103/8/2010 9:07:11 AMAFAIL
Areas of the channel are still inb need of repair. But due to the sampoling result of the turbidity reading the RP is in the thought that if the repair are made it could excalate the problems. But per BMC 8-17 all BMP must be maintained. Also this is the rule of the CGP. Will monitor the channel for further issues.
ESC08-00842 BMP Violation3/4/20103/8/20103/8/2010 8:34:06 AMAFAIL
Verbal to RP:
Install the sediment barrier along Grace St. "J" hook the sediment barrier at the point where the disturbed soil meets with the concrete gutter pan. Also to install the witches hat back into the storm drain inlet. Spoke with ACHD over the storm drain system being overwelmed with water. No matter to instaal storm drain inlet protection to the RP. Will re-inspect on 3/9/10 PM.