FIR10-00569
| INSP-Sprinkler Rough-in/Hydro | 3/8/2011 | 3/8/2011 | 3/8/2011 12:00:00 AM | P | DONE |
|
|
Hydro passed.
Rough in passed except for adding one brace to the main where a new offset was added. The hydraulics had enough cushion that the offset did not adversely affect the hydraulic calculation. One drop plug in restroom awaiting ceiling.
|