FIR13-00011
| INSP-Sprinkler Rough-in | 3/6/2013 | 3/8/2013 | 3/13/2013 7:45:24 AM | A | PART |
|
|
Refer to stamped plan set regarding 3rd floor rough-in correction items including spacing, obstructions, field changes, incompleted piping due to construction underway, hangers, coverage at the electrical room.
|
BLD12-03060
| FIRE-Final Inspection | 3/7/2013 | 3/8/2013 | 3/8/2013 5:13:28 PM | P | NR |
|
|
Pending fire alarm testing.
|
BLD12-02009
| FIRE-Final Inspection | 3/8/2013 | 3/8/2013 | 3/8/2013 5:12:04 PM | P | NR |
|
|
Project related fire alarm work must be finaled prior to fire life safety approvals.
|
FIR13-00073
| INSP-Sprinkler Rough-in | 3/7/2013 | 3/8/2013 | 3/8/2013 2:00:11 PM | A | PART |
|
|
Rough-in inspection passed. Final pending ceiling repairs.
|
BLD12-03286
| FIRE-Final Inspection | 3/7/2013 | 3/8/2013 | 3/8/2013 1:40:21 PM | A | PASS |
|
|
Fire life safety is approved pending one fire extinguisher is placed in the existing cabinet as discussed.
|
FIR13-00076
| INSP-Final Inspection | 3/7/2013 | 3/8/2013 | 3/8/2013 1:38:34 PM | A | PASS |
|
|
Scope of fire sprinkler work is complete. Permit finaled.
|
BLD13-00354
| FIRE-Final Inspection | 3/4/2013 | 3/8/2013 | 3/8/2013 12:12:28 PM | A | FAIL |
|
|
Correction items noted include; post building address, remove manual thumbturn at the main entry/exit, provide approved hardware at the kitchen area exit, remove storage in the basement- mechanical equipment only allowed.
|
FIR13-00040
| INSP-Final Inspection | 3/7/2013 | 3/8/2013 | 3/8/2013 12:09:11 PM | A | PASS |
|
|
Fire alarm work passed inspection and testing. Permit finaled.
|