Inspections for the day of: Friday, March 8, 2013.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00183 Site Preparation3/8/20133/8/20133/18/2013 9:45:41 AM PASS
ESC12-00923 Aging Inspection3/8/20133/8/20133/8/2013 2:11:51 PM PASS
ESC12-00539 General Inspection3/8/20133/8/20133/8/2013 1:51:55 PMPPASS
Have completed the with initating stabilization measures in thewarm springs creek widening portion of the phase 8 and 9 modification.
ESC12-00023 General Inspection3/8/20133/8/20133/8/2013 1:41:33 PM DONE
Waiting on vegitation to become establish.
ESC12-01146 General Inspection3/8/20133/8/20133/8/2013 1:41:04 PM PASS
ESC11-00176 General Inspection3/8/20133/8/20133/8/2013 1:40:53 PM PASS
ESC11-00732 General Inspection3/8/20133/8/20133/8/2013 1:40:46 PM FAIL
Verbal to RP on 3/6/2013 to remove all silt fence along all of the green belt. Will follow up on 3/13/2013
ESC12-00879 Aging Inspection3/8/20133/8/20133/8/2013 1:39:07 PM PASS
ESC12-00881 Aging Inspection3/8/20133/8/20133/8/2013 1:39:01 PM PASS
ESC12-01119 BMP Violation3/7/20133/8/20133/8/2013 1:38:45 PMAPART
Must still contruct a contained washout proir to the next pour date.
ESC12-01173 Conference3/5/20133/8/20133/8/2013 1:38:02 PMADONE
Explained to applicant to submit the SWPPP as a plan modification, contact Public Works for grading and drainage requirements. Submit the modifications proir to beginning any land disturbing activities.
ESC12-00599 General Inspection3/4/20133/8/20133/8/2013 8:48:56 AMAFAIL
RP is out sick. Discussed with the Foreman (Jimmy).
Must have the plan alterations and permit application amendments submitted no later than 3/13/2013.