BLD15-04361
| BLD-Framing/Rough-in | 3/8/2016 | 3/8/2016 | 3/8/2016 4:40:56 PM | P | NR |
|
|
Kevin Phone #: ###-#### need doc s from planreview bld and mec
|
BLD14-01829
| BLD-Framing/Rough-in | 3/7/2016 | 3/8/2016 | 3/8/2016 4:39:38 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt c/n made ok framing ok to insulate roof/ truss letter to be on site
|
BLD15-03767
| BLD-Framing/Rough-in | 3/8/2016 | 3/8/2016 | 3/8/2016 4:37:11 PM | P | PASS |
|
|
Boyd Phone #: ###-####
|
BLD15-00516
| BLD-Framing/Rough-in | 3/8/2016 | 3/8/2016 | 3/8/2016 4:24:31 PM | P | PASS |
|
|
Randy Phone #: ###-#### corridors ok to cover1 thur 4
|
BLD16-00389
| BLD-Final | 3/7/2016 | 3/8/2016 | 3/8/2016 2:14:22 PM | P | PASS |
|
|
would like call ahead; Larry Phone #: ###-####
|
BLD15-03598
| BLD-Framing/Rough-in | 3/8/2016 | 3/8/2016 | 3/8/2016 1:24:01 PM | P | PASS |
|
|
Bob Phone #: ###-####
|
BLD14-02221
| BLD-Conference | 3/8/2016 | 3/8/2016 | 3/8/2016 1:23:30 PM | P | DONE |
|
|
Framer has questions on header sizes Phone #: ###-#### Inspection requested via web by Daniel Appel
|
BLD16-00454
| BLD-Framing/Rough-in | 3/7/2016 | 3/8/2016 | 3/8/2016 1:22:51 PM | P | PASS |
|
|
Brad Phone #: ###-####
|
BLD16-00477
| BLD-Footing | 3/7/2016 | 3/8/2016 | 3/8/2016 9:24:20 AM | A | NR |
|
|
Preston Phone #: ###-####
|
BLD14-02434
| BLD-Final | 3/7/2016 | 3/8/2016 | 3/8/2016 8:44:44 AM | A | NR |
|
|
Please call me before so I can meet you there
Thank you Phone #: ###-#### Inspection requested via web by Justin Ellett no insp. need pw insp.
|