Inspections for the day of: Tuesday, March 8, 2016.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00709 INSP-Sprinkler Rough-in3/8/20163/8/20163/8/2016 2:17:01 PMPPASS
The first floor main corridor pipe hanger attachment points are ok to cover. The is for the 2 1/2" main and 6" main.
NAF16-00017 INSP-Sprinkler Rough-in/Hydro3/7/20163/8/20163/8/2016 1:27:40 PMADONE
Todays inspection request was a conference to discuss the classI electrical at the door to the paint booth. The contractor is to meet the 3' vertical and 5' horizontal requirement for the class I wiring. Also per Scott and my discussion the owner is to provide signage at both sides of the overhead doors (no smoking, no welding, no grinding..ect.) instead of meeting the 6' clearance requirement from exterior walls. The 6' requirement can't be met due to meeting the 30' from property line requirement. All references are derived from the 2012 IFC chapter 24.
FIR15-00880 INSP-Final Inspection3/7/20163/8/20163/8/2016 11:11:12 AMAPASS
permit finaled
FIR15-00715 INSP-Final Inspection3/8/20163/8/20163/8/2016 7:09:00 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball