FIR15-00709
| INSP-Sprinkler Rough-in | 3/8/2016 | 3/8/2016 | 3/8/2016 2:17:01 PM | P | PASS |
|
|
The first floor main corridor pipe hanger attachment points are ok to cover. The is for the 2 1/2" main and 6" main.
|
NAF16-00017
| INSP-Sprinkler Rough-in/Hydro | 3/7/2016 | 3/8/2016 | 3/8/2016 1:27:40 PM | A | DONE |
|
|
Todays inspection request was a conference to discuss the classI electrical at the door to the paint booth. The contractor is to meet the 3' vertical and 5' horizontal requirement for the class I wiring. Also per Scott and my discussion the owner is to provide signage at both sides of the overhead doors (no smoking, no welding, no grinding..ect.) instead of meeting the 6' clearance requirement from exterior walls. The 6' requirement can't be met due to meeting the 30' from property line requirement. All references are derived from the 2012 IFC chapter 24.
|
FIR15-00880
| INSP-Final Inspection | 3/7/2016 | 3/8/2016 | 3/8/2016 11:11:12 AM | A | PASS |
|
|
permit finaled
|
FIR15-00715
| INSP-Final Inspection | 3/8/2016 | 3/8/2016 | 3/8/2016 7:09:00 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|