Inspections for the day of: Tuesday, March 8, 2016.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01532 General Inspection3/8/20163/8/20163/9/2016 3:46:37 PMPCANC
rescheduled
ESC16-00195 Site Preparation3/8/20163/8/20163/8/2016 3:40:47 PMPPASS
Permit sign posted. MS4 inlet on Ave B and Myrtle has sediment protection. Approved.
ESC15-00065 General Inspection3/8/20163/8/20163/8/2016 3:21:54 PM PASS
Landscaping in progress. No trackout or discharges.
ESC15-00094 General Inspection3/8/20163/8/20163/8/2016 3:21:07 PM PASS
Hillsides in good condition. No significant or observable erosion rills or gullies. BMPs installed in areas of risk. No sediment blow outs or evidence of turbid dishcarges. No corrections at this time.
ESC15-00024 General Inspection3/8/20163/8/20163/8/2016 3:09:40 PM PEND
need to remove DI bag to final. Home now landscaped.
ESC15-00955 General Inspection3/8/20163/8/20163/8/2016 2:54:36 PMPPASS
Minor work in progress on landscaping park features. No trackout, permit sign ans SWPPP information is posted. No corrections issued, no violations observed.
ESC16-00156 General Inspection3/8/20163/8/20163/8/2016 2:36:52 PMPPART
Permit sign posted. Silt fence and vegetative buffer preservation have been installed per ESC site plan and SF is trenched properly. New DI bags installed on inlets with potential to receive stormwater.

Construction entance is not installed in location where dump/haul trucks will use. No major trackout, but will be very bad in wet conditions. Request to install construction entrance per construction sheet details and use signage and/or training to driver/haulers to utilize it to prevent trackout issues

No site prep inspection/notification requested prior to earth disturbance and after permit issuance.
ESC13-01159 General Inspection3/4/20163/8/20163/8/2016 2:30:02 PMAPART
WIP on new SFHs by CBH. DI sediment bags installed, no significant trackout or uncontained trash/materials at site. Permit signs posted.

Correction:

New designated washout facility required for concrete foundation work
ESC16-00269 Site Preparation3/7/20163/8/20163/8/2016 10:45:23 AMAPASS
Lavon Phone #: ###-####

RP familiar with ESC permit conditions. Construction of patio and landscaping project to begin today. Main BMPs are preservation of existing vegetation and housekeeping/sweeping oas needed.
ESC15-00035 General Inspection3/8/20163/8/20163/8/2016 10:45:23 AM PASS
No activity. Revegetating. Temp silt fences installed.
ESC14-00599 Aging Inspection3/8/20163/8/20163/8/2016 9:48:39 AM PASS
ESC14-00598 Aging Inspection3/8/20163/8/20163/8/2016 8:57:50 AM PASS
ESC14-00597 Aging Inspection3/8/20163/8/20163/8/2016 8:57:42 AM PASS
ESC14-00596 Aging Inspection3/8/20163/8/20163/8/2016 8:57:31 AM PASS
ESC14-00595 Aging Inspection3/8/20163/8/20163/8/2016 8:57:23 AM PASS