PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, March 8, 2016
.
Number of inspections:
15
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC15-01532
General Inspection
3/8/2016
3/8/2016
3/9/2016 3:46:37 PM
P
CANC
rescheduled
ESC16-00195
Site Preparation
3/8/2016
3/8/2016
3/8/2016 3:40:47 PM
P
PASS
Permit sign posted. MS4 inlet on Ave B and Myrtle has sediment protection. Approved.
ESC15-00065
General Inspection
3/8/2016
3/8/2016
3/8/2016 3:21:54 PM
PASS
Landscaping in progress. No trackout or discharges.
ESC15-00094
General Inspection
3/8/2016
3/8/2016
3/8/2016 3:21:07 PM
PASS
Hillsides in good condition. No significant or observable erosion rills or gullies. BMPs installed in areas of risk. No sediment blow outs or evidence of turbid dishcarges. No corrections at this time.
ESC15-00024
General Inspection
3/8/2016
3/8/2016
3/8/2016 3:09:40 PM
PEND
need to remove DI bag to final. Home now landscaped.
ESC15-00955
General Inspection
3/8/2016
3/8/2016
3/8/2016 2:54:36 PM
P
PASS
Minor work in progress on landscaping park features. No trackout, permit sign ans SWPPP information is posted. No corrections issued, no violations observed.
ESC16-00156
General Inspection
3/8/2016
3/8/2016
3/8/2016 2:36:52 PM
P
PART
Permit sign posted. Silt fence and vegetative buffer preservation have been installed per ESC site plan and SF is trenched properly. New DI bags installed on inlets with potential to receive stormwater.
Construction entance is not installed in location where dump/haul trucks will use. No major trackout, but will be very bad in wet conditions. Request to install construction entrance per construction sheet details and use signage and/or training to driver/haulers to utilize it to prevent trackout issues
No site prep inspection/notification requested prior to earth disturbance and after permit issuance.
ESC13-01159
General Inspection
3/4/2016
3/8/2016
3/8/2016 2:30:02 PM
A
PART
WIP on new SFHs by CBH. DI sediment bags installed, no significant trackout or uncontained trash/materials at site. Permit signs posted.
Correction:
New designated washout facility required for concrete foundation work
ESC16-00269
Site Preparation
3/7/2016
3/8/2016
3/8/2016 10:45:23 AM
A
PASS
Lavon Phone #: ###-####
RP familiar with ESC permit conditions. Construction of patio and landscaping project to begin today. Main BMPs are preservation of existing vegetation and housekeeping/sweeping oas needed.
ESC15-00035
General Inspection
3/8/2016
3/8/2016
3/8/2016 10:45:23 AM
PASS
No activity. Revegetating. Temp silt fences installed.
ESC14-00599
Aging Inspection
3/8/2016
3/8/2016
3/8/2016 9:48:39 AM
PASS
ESC14-00598
Aging Inspection
3/8/2016
3/8/2016
3/8/2016 8:57:50 AM
PASS
ESC14-00597
Aging Inspection
3/8/2016
3/8/2016
3/8/2016 8:57:42 AM
PASS
ESC14-00596
Aging Inspection
3/8/2016
3/8/2016
3/8/2016 8:57:31 AM
PASS
ESC14-00595
Aging Inspection
3/8/2016
3/8/2016
3/8/2016 8:57:23 AM
PASS