MEC17-00589
| Conference | 3/8/2017 | 3/8/2017 | 3/8/2017 4:15:25 PM | P | PASS |
|
|
|
MEC17-00589
| Final | 3/8/2017 | 3/8/2017 | 3/8/2017 4:15:03 PM | P | PASS |
|
|
|
MEC17-00825
| Final | 3/6/2017 | 3/8/2017 | 3/8/2017 4:03:57 PM | P | PASS |
|
|
Please meet homeowner Marilyn onsite. Please give 15 to 30 minute arrival notice. Thank you. Phone #: ###-#### Inspection requested via web by Rick Montgomery
|
MEC17-00857
| Final | 3/8/2017 | 3/8/2017 | 3/8/2017 3:46:29 PM | P | PASS |
|
|
Would like early PM thank you Phone #: ###-#### Inspection requested via web by Xanti Berria
|
MEC16-04183
| Pressure Test | 3/7/2017 | 3/8/2017 | 3/8/2017 3:32:12 PM | P | PART |
|
|
RICH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 60 lb gas pass on (1) 1.5 pipe and (2) 1.25 pipe from meter bar to inside of building to unit heaters and stubs thru roof- will test roof at another time (3) places
|
MEC16-04590
| Rough-in | 3/8/2017 | 3/8/2017 | 3/8/2017 3:22:45 PM | P | PART |
|
|
We need a R/I to cover, please call Arthur. Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum- seal on duct ok- ok to insulate office space
|
MEC17-00792
| Rough-in | 3/8/2017 | 3/8/2017 | 3/8/2017 1:58:51 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ed Ables
|
MEC17-00164
| Final | 3/8/2017 | 3/8/2017 | 3/8/2017 1:29:58 PM | P | FAIL |
|
|
outside of the home // Brandon Phone #: ###-####- line sets need uv protection on armor flex on both units outside-
|
MEC15-03353
| Mec-Aging Inspection | 3/8/2017 | 3/8/2017 | 3/8/2017 11:33:47 AM | | CANC |
|
|
|
MEC15-03353
| DOC - Permit Expired | 3/8/2017 | 3/8/2017 | 3/8/2017 11:33:38 AM | P | PASS |
|
|
|
MEC16-05309
| Final | 3/6/2017 | 3/8/2017 | 3/8/2017 11:31:33 AM | A | PASS |
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek
|
MEC17-00639
| Rough-in | 3/7/2017 | 3/8/2017 | 3/8/2017 11:18:04 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- need insulation shield above sheetrock in garage around b vent- flue test fail- stuck on 6.5 psi
|
MEC17-00639
| Pressure Test | 3/7/2017 | 3/8/2017 | 3/8/2017 11:16:16 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- 20lb gas pass
|
MEC17-00818
| Final | 3/8/2017 | 3/8/2017 | 3/8/2017 10:52:58 AM | P | CANC |
|
|
Please call Carla the homeowner when you are headed to her home. Her number is ###-####. Thanks. Phone #: ###-#### >> Inspection requested via web by Kim Lithander Inspection cancelled from web by: Kim Lithander
|
MEC17-00157
| Final | 3/6/2017 | 3/8/2017 | 3/8/2017 10:38:12 AM | A | PASS |
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek
|
MEC16-04793
| Final | 3/3/2017 | 3/8/2017 | 3/8/2017 10:21:53 AM | A | PASS |
|
|
Please contact Chris 30-45 minutes prior to arrival at ###-####. Phone #: ###-#### Inspection requested via web by Andrea Grigsby-
|
MEC17-00851
| Rough-in | 3/7/2017 | 3/8/2017 | 3/8/2017 9:27:08 AM | A | PASS |
|
|
Shaun: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello- R/I ok
|
MEC16-04963
| Rough-in | 3/6/2017 | 3/8/2017 | 3/8/2017 8:54:11 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- ok for cover
|
MEC16-03352
| Final | 3/3/2017 | 3/8/2017 | 3/7/2017 3:54:14 PM | A | CANC |
|
|
Installation of Air Handler & Heat pump. Requesting final inspection. Call Eric @ ###-#### with any installation issues/questions. Phone #: ###-#### >> Inspection requested via web by Annie Foster Inspection cancelled from web by: Annie Foster
|