Inspections for the day of: Wednesday, March 8, 2017.
Number of inspections: 14
Percentage of inspections complete: 93 %
Percentage of inspections not complete: 7 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS16-00397 BLD-Conference1/20/20173/3/2017 A 
Check on progres/status.
BLD16-03666 BLD-Framing/Rough-in3/8/20173/8/20173/8/2017 4:16:41 PMPCANC
BLD16-03666 BLD-Framing/Rough-in3/2/20173/8/20173/8/2017 4:16:13 PMPPART
Roof nailing, north wing, south side. Needs to nail off drag trusses.
BLD16-03361 BLD-Footing3/7/20173/8/20173/8/2017 4:11:46 PMPCANC
Dane Phone #: ###-####. cancelled by contractor via phone call.
BLD16-04504 BLD-Framing/Rough-in3/8/20173/8/20173/8/2017 3:43:25 PMPPASS
Tom Phone #: ###-####-please do inspection late pm so the ele inspector can do his inspection early am. Phase 1, interior steel stud framed walls for offices, breakroom.
BLD12-00927 BLD-Final3/8/20173/8/20173/8/2017 3:28:31 PMPPASS
BLD12-00927 DOC - Permit Finaled3/8/20173/8/20173/8/2017 3:28:23 PMPPASS
BLD12-00927 BLD-Framing/Rough-in3/8/20173/8/20173/8/2017 3:28:13 PMPDONE
BLD12-00927 BLD-Conference3/3/20173/8/20173/8/2017 3:28:00 PMPDONE
After2:00pm.
BLD17-00032 BLD-Framing/Rough-in3/8/20173/8/20173/8/2017 2:15:17 PMPPASS
2hr. fire walls ok in attic area.
BLD16-04539 BLD-Framing/Rough-in3/6/20173/8/20173/8/2017 1:27:45 PMPPASS
Kevin Phone #: ###-####
BLD17-00032 BLD-Framing/Rough-in3/7/20173/8/20173/8/2017 10:49:19 AMACANC
call ahead for access; Don Phone #: ###-####. Moved to pm.
BLD16-04287 BLD-Energy code compliance3/7/20173/8/20173/8/2017 9:24:41 AMAPASS
Kelly Phone #: ###-####
BLD17-00254 BLD-Footing3/7/20173/8/20173/8/2017 8:57:15 AMAPASS
Sabation Phone #: ###-####