MIS16-00397
| BLD-Conference | 1/20/2017 | 3/3/2017 | | A | |
|
|
Check on progres/status.
|
BLD16-03666
| BLD-Framing/Rough-in | 3/8/2017 | 3/8/2017 | 3/8/2017 4:16:41 PM | P | CANC |
|
|
|
BLD16-03666
| BLD-Framing/Rough-in | 3/2/2017 | 3/8/2017 | 3/8/2017 4:16:13 PM | P | PART |
|
|
Roof nailing, north wing, south side. Needs to nail off drag trusses.
|
BLD16-03361
| BLD-Footing | 3/7/2017 | 3/8/2017 | 3/8/2017 4:11:46 PM | P | CANC |
|
|
Dane Phone #: ###-####. cancelled by contractor via phone call.
|
BLD16-04504
| BLD-Framing/Rough-in | 3/8/2017 | 3/8/2017 | 3/8/2017 3:43:25 PM | P | PASS |
|
|
Tom Phone #: ###-####-please do inspection late pm so the ele inspector can do his inspection early am. Phase 1, interior steel stud framed walls for offices, breakroom.
|
BLD12-00927
| BLD-Final | 3/8/2017 | 3/8/2017 | 3/8/2017 3:28:31 PM | P | PASS |
|
|
|
BLD12-00927
| DOC - Permit Finaled | 3/8/2017 | 3/8/2017 | 3/8/2017 3:28:23 PM | P | PASS |
|
|
|
BLD12-00927
| BLD-Framing/Rough-in | 3/8/2017 | 3/8/2017 | 3/8/2017 3:28:13 PM | P | DONE |
|
|
|
BLD12-00927
| BLD-Conference | 3/3/2017 | 3/8/2017 | 3/8/2017 3:28:00 PM | P | DONE |
|
|
After2:00pm.
|
BLD17-00032
| BLD-Framing/Rough-in | 3/8/2017 | 3/8/2017 | 3/8/2017 2:15:17 PM | P | PASS |
|
|
2hr. fire walls ok in attic area.
|
BLD16-04539
| BLD-Framing/Rough-in | 3/6/2017 | 3/8/2017 | 3/8/2017 1:27:45 PM | P | PASS |
|
|
Kevin Phone #: ###-####
|
BLD17-00032
| BLD-Framing/Rough-in | 3/7/2017 | 3/8/2017 | 3/8/2017 10:49:19 AM | A | CANC |
|
|
call ahead for access; Don Phone #: ###-####. Moved to pm.
|
BLD16-04287
| BLD-Energy code compliance | 3/7/2017 | 3/8/2017 | 3/8/2017 9:24:41 AM | A | PASS |
|
|
Kelly Phone #: ###-####
|
BLD17-00254
| BLD-Footing | 3/7/2017 | 3/8/2017 | 3/8/2017 8:57:15 AM | A | PASS |
|
|
Sabation Phone #: ###-####
|