ESC16-00770
| General Inspection | 3/1/2017 | 3/8/2017 | 3/15/2017 2:33:19 PM | P | CANC |
|
|
follow up on corrections from 3/1
rescheduled
|
ESC16-00964
| General Inspection | 3/8/2017 | 3/8/2017 | 3/13/2017 7:58:02 AM | | CANC |
|
|
|
ESC16-00982
| General Inspection | 3/8/2017 | 3/8/2017 | 3/10/2017 1:43:45 PM | | CANC |
|
|
|
ESC16-00870
| General Inspection | 3/3/2017 | 3/8/2017 | 3/9/2017 12:17:51 PM | P | PASS |
|
|
Painting and final landscaping in progress. Culdesac was swept. No new corrections.
|
ESC16-01630
| General Inspection | 3/3/2017 | 3/8/2017 | 3/9/2017 12:17:09 PM | P | PEND |
|
|
Spotted Dove clean up efforts
Morninggale culdesac has been swept. No we trackout.
Need to clean up scrap wood strewn around site.
Will continue to monitor but site conditions have been improved.
|
ESC16-00797
| Aging Inspection | 3/8/2017 | 3/8/2017 | 3/9/2017 12:12:54 PM | | PASS |
|
|
Pool complete in backyard. No loose dirt or materials onsite, ESC permit finaled.
|
ESC16-01009
| Tracking Control | 3/8/2017 | 3/8/2017 | 3/9/2017 11:31:26 AM | P | PART |
|
|
Trackout reported from yesterday was swept. Inlet down gradient from entrance area has sediment filter bag properly installed.
Verbal correction request to RP: - repost new ESC permit sign on SWPPP board - improve construction entrance trackout controls: i.e. lengthen entrance distance, turn over existing rock, add angular rock chunks, wheel brooming and regular cleaning of sidewalk apron
Will check on entrance improvements next week.
|
ESC16-01360
| Site Final | 3/8/2017 | 3/8/2017 | 3/9/2017 10:25:59 AM | P | PASS |
|
|
Project is complete. The land owner is responsible for re-paving. All areas are stabilized with road mix at this time. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
No materials or temp BMPs related remaining from IPC phase of project for Fairview & Cole. Knife River working on intersection in ROW areas. No further inspections required on this permit, conditions satisfied.
|
ESC16-00984
| General Inspection | 3/8/2017 | 3/8/2017 | 3/9/2017 10:02:15 AM | | PASS |
|
|
WIP on Aberdeen apartment phase. 4 buildings with ESC permits and one site development permit ESC16-00324,
No stormwater discharges from site, no trackout. Trash contained in bins. Private onsite stormwater system installed - inlets need sediment protection.
Will check for sweeping and site housekeeping next inspection, no significant issues at this time
|
ESC16-00966
| General Inspection | 3/8/2017 | 3/8/2017 | 3/9/2017 8:21:14 AM | | CANC |
|
|
no trackout or discharges observed on 3/7 ; need to pick up windblown trash and debris on site and slopes below home. Inspection scheduled for next week
|
ESC04-00572
| DOC - Permit Finaled | 3/8/2017 | 3/8/2017 | 3/8/2017 11:25:49 AM | P | PASS |
|
|
old expired permit removed from database... no inspection
|
ESC16-00319
| General Inspection | 3/8/2017 | 3/8/2017 | 3/8/2017 8:44:37 AM | | PEND |
|
|
lower hillside re-vegeation in process. No corrections or actions requested
|
ESC16-00973
| General Inspection | 3/8/2017 | 3/8/2017 | 3/8/2017 7:54:32 AM | | CANC |
|
|
rescheduled for 3/10
|
ESC16-00793
| Aging Inspection | 3/8/2017 | 3/8/2017 | 3/8/2017 7:53:52 AM | | PEND |
|
|
No issues observed or reported by Parks n Rec crew for Parks n Rec projects.
Need to resolve permit for 5th Street entry into Julia Davis Park and reviewing procedures when construction activity requires dewatering into Parks waterways.
|
ESC16-00724
| Aging Inspection | 3/8/2017 | 3/8/2017 | 3/8/2017 7:47:44 AM | | PASS |
|
|
Home complete, needs landscaping. Hickories sub and Clark Homes in compliance currently
|