ELE13-03192
| ELE-Aging Inspection | 3/8/2018 | 3/8/2018 | 3/14/2018 9:50:38 AM | | DONE |
|
|
Talked with owner and work will be cancelled, need to figure what order to take to close out permit
|
ELE12-01786
| Final | 3/8/2018 | 3/8/2018 | 3/8/2018 4:07:12 PM | P | PASS |
|
|
p/s final
|
ELE13-02905
| Final | 3/8/2018 | 3/8/2018 | 3/8/2018 4:06:51 PM | P | PASS |
|
|
Sign final only Sign final ok
|
ELE18-00838
| Rough-In Permanent Service | 3/7/2018 | 3/8/2018 | 3/8/2018 12:50:12 PM | P | PASS |
|
|
We need an underground inspection and an okay to energize. Jack Carl is the electrician who will be the contact. Thank you Phone #: ###-#### Inspection requested via web by A.M.E. Office U/G from pole to shop ok to cover Fault current cal is 4328 from L-N
|
ELE18-00456
| Final | 3/8/2018 | 3/8/2018 | 3/8/2018 12:47:23 PM | P | PASS |
|
|
Final Contractor proved U/L listing of pop up type assembly but is still not tamper resistant and he added a receptacle at end of island for code requirements Final ok
|
ELE18-00670
| Final | 3/7/2018 | 3/8/2018 | 3/8/2018 11:05:03 AM | P | CANC |
|
|
Inspect panel change-out. I pulled a second permit for the panel change-out. Thank you, Lonnie Phone #: ###-#### >> Inspection requested via web by Lonnie Sorichta Inspection cancelled from web by: Lonnie Sorichta
|
ELE18-00456
| Final | 3/7/2018 | 3/8/2018 | 3/8/2018 10:59:56 AM | A | FAIL |
|
|
Please coordinate with Jose for access to home. Phone #: ###-#### Inspection requested via web by Jose Guerrero 110 All equipment installed shall be U/L (need verification for pop up oultet) 408 All receptacles shall be tamper resistant type.
|
ELE17-03324
| Electrical Rough-In | 3/7/2018 | 3/8/2018 | 3/8/2018 10:56:42 AM | A | PASS |
|
|
2nd floor bathrooms and porte cortier Phone #: ###-#### Inspection requested via web by Tom Jenkins 2nd floor and car port ok to cover
|
ELE18-00682
| Final | 3/7/2018 | 3/8/2018 | 3/8/2018 10:26:11 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bryan Atkins Warehouse final ok, card on on-site to sign
|
ELE18-00795
| Electrical Rough-In | 3/7/2018 | 3/8/2018 | 3/8/2018 9:42:07 AM | A | PASS |
|
|
We will have to meet you there, please call Clay at ###-#### when on the way Phone #: ###-#### Inspection requested via web by Clayton Morgan Up bed by bath ok to cover
|
ELE17-02919
| Final | 3/7/2018 | 3/8/2018 | 3/8/2018 9:14:56 AM | A | PART |
|
|
I can meet at 9:00 if that''s fine! Steve Phone #: ###-#### Inspection requested via web by Steven Meredith Part final, all life safety checked out and contractor will provide one more inspection for front patio receptacle that will be added.
|
ELE13-02905
| ELE-Aging Inspection | 3/8/2018 | 3/8/2018 | 3/8/2018 8:41:49 AM | | DONE |
|
|
Will final permit sign is installed
|
ELE13-01800
| ELE-Aging Inspection | 3/8/2018 | 3/8/2018 | 3/8/2018 6:39:43 AM | | CANC |
|
|
Toobusy
|
ELE13-03253
| ELE-Aging Inspection | 3/8/2018 | 3/8/2018 | 3/8/2018 6:39:29 AM | | CANC |
|
|
Too busy
|