ELE19-00789
| Final | 3/8/2019 | 3/8/2019 | 3/8/2019 2:09:08 PM | P | CANC |
|
|
Jason is the contact his cell is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates Talked to Jason. He is going to re-configure service equipt and call it in next week sometime.
|
ELE19-00519
| Final | 3/8/2019 | 3/8/2019 | 3/8/2019 1:24:45 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Rasmussen Ok final. Labeling needed is present.
|
ELE19-00746
| Final | 3/8/2019 | 3/8/2019 | 3/8/2019 1:09:35 PM | P | CANC |
|
|
New power for paint booth heater. Inside transformer test building. Call David Forbes for access to Idaho Power. Phone #: ###-#### >> Inspection requested via web by Tod Lane Inspection cancelled from web by: Tod Lane
|
ELE18-03701
| Permanent Service | 3/7/2019 | 3/8/2019 | 3/8/2019 12:14:46 PM | A | FAIL |
|
|
James Phone #: ###-#### 200a feed through meter main used. Need 100a 2-pole brkr placed below 200a main. Wires terminated on feed through lugs are sized for a 100a panel. Also need equipt ground wire, and attach grounding electrode conductor to 2nd ground rod.
|
ELE19-00812
| Temporary Service | 3/7/2019 | 3/8/2019 | 3/8/2019 12:10:35 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Nelson t/s u/g n ok
|
ELE18-04130
| Final | 3/7/2019 | 3/8/2019 | 3/8/2019 10:31:00 AM | A | PASS |
|
|
2010 code Phone #: ###-#### Inspection requested via web by danny perrine Ok final.
|
ELE18-04686
| Final | 3/7/2019 | 3/8/2019 | 3/8/2019 10:26:14 AM | A | PASS |
|
|
Garage code is 5477 thanks Phone #: ###-#### Inspection requested via web by Ryan Wilson Ok final.
|
ELE19-00461
| Permanent Service | 3/7/2019 | 3/8/2019 | 3/8/2019 8:58:40 AM | A | PASS |
|
|
Service Inspection Requested. Contact Keith Chetta @###-#### with questions.
Thank you ; have a nice day! Phone #: ###-#### Inspection requested via web by JENNY EMEL Upper 70a breaker only good for #2 alum. #1 SER has been pulled. Strands may not be cut off to make wire fit in breaker terminals. Will need to see wire reducers installed for 70a breaker upon final. p/s o/h n ok
|