MEC00-00761
| Final | 3/8/2000 | 3/9/2000 | 3/9/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/08/2000 at 10:37:07. Contact: ###-####. Burner to be 18" above floor. 3/14/00 10:36:01 AM
|
MEC00-00681
| Pressure Test | 3/8/2000 | 3/9/2000 | 3/9/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/08/2000 at 11:52:27. Contact: ###-####.
|
MEC00-00148
| Final | 3/8/2000 | 3/9/2000 | 3/9/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/08/2000 at 13:47:29. Contact: ###-####. Install gas valves at regulators. 3/9/00 2:20:03 PM
|
MEC00-00361
| Rough-in | 3/8/2000 | 3/9/2000 | 3/9/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/08/2000 at 15:16:48. Contact: ###-####. Passed 2/23/00. 3/9/00 2:19:20 PM
|
MEC00-00681
| Rough-in | 3/8/2000 | 3/9/2000 | 3/9/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/08/2000 at 15:19:39. Contact: ###-####.
|
MEC00-00738
| Pressure Test | 3/9/2000 | 3/9/2000 | 3/9/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/09/2000 at 07:55:50. Contact: ###-####.
|
MEC00-00714
| Final | 3/9/2000 | 3/9/2000 | 3/9/2000 12:00:00 AM | P | FAIL |
|
|
###-####\\this is only a gas test, no equipment on this permit. Gas fail use 30 psi gage 3/14/00 10:39:49 AM
|
MEC00-00670
| Final | 3/7/2000 | 3/9/2000 | 3/9/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/07/2000 at 13:13:52. Contact: ###-####.call first Howard remove damper. 3/14/00 10:39:36 AM
|