Inspections for the day of: Thursday, March 9, 2000.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-00761 Final3/8/20003/9/20003/9/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/08/2000 at 10:37:07. Contact: ###-####. Burner to be 18" above floor. 3/14/00 10:36:01 AM
MEC00-00681 Pressure Test3/8/20003/9/20003/9/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/08/2000 at 11:52:27. Contact: ###-####.
MEC00-00148 Final3/8/20003/9/20003/9/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/08/2000 at 13:47:29. Contact: ###-####. Install gas valves at regulators. 3/9/00 2:20:03 PM
MEC00-00361 Rough-in3/8/20003/9/20003/9/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/08/2000 at 15:16:48. Contact: ###-####. Passed 2/23/00. 3/9/00 2:19:20 PM
MEC00-00681 Rough-in3/8/20003/9/20003/9/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/08/2000 at 15:19:39. Contact: ###-####.
MEC00-00738 Pressure Test3/9/20003/9/20003/9/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/09/2000 at 07:55:50. Contact: ###-####.
MEC00-00714 Final3/9/20003/9/20003/9/2000 12:00:00 AMPFAIL
###-####\\this is only a gas test, no equipment on this permit. Gas fail use 30 psi gage 3/14/00 10:39:49 AM
MEC00-00670 Final3/7/20003/9/20003/9/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/07/2000 at 13:13:52. Contact: ###-####.call first Howard remove damper. 3/14/00 10:39:36 AM