PLM00-01672
| Final | 3/8/2001 | 3/9/2001 | 3/9/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/08/2001 at 12:21:27. Contact: ###-####. double check needs to be certified need handle for main shut-off valve. no water to hot side of mop sink. 3/9/2001 12:13:06 PM
|
PLM01-00613
| Sprinkler (Final) | 3/8/2001 | 3/9/2001 | 3/9/2001 12:00:00 AM | A | PASS |
|
|
monty-- ###-#### backflow
|
PLM01-00342
| Plumbing Rough-in | 3/9/2001 | 3/9/2001 | 3/9/2001 12:00:00 AM | P | PART |
|
|
###-#### arear (7) first and second floor men and women rest room and break room sinks water only air test ok. second floor men restroom water needs nail-plates missing a few riser clamps on vents through floor. 3/9/2001 3:12:16 PM
|
PLM01-00616
| Water and/or Sewer | 3/9/2001 | 3/9/2001 | 3/9/2001 12:00:00 AM | P | PASS |
|
|
###-####
|