Inspections for the day of: Friday, March 9, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00019 BLD-Other3/6/20013/9/20013/9/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/06/2001 at 14:24:48. Contact: ###-####. pods as per manufactures specs ceiling grid, need letter from architect. 3/9/2001 11:09:04 AM
BLD00-03417 BLD-Final3/8/20013/9/20013/9/2001 12:00:00 AMAPASS
###-####
MEC01-00625 Rough-in3/8/20013/9/20013/9/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/08/2001 at 14:09:29. Contact: ###-####.
BLD00-03685 BLD-Framing/Rough-in3/8/20013/9/20013/9/2001 12:00:00 AMAPART
Tim Wilson ###-#### need to complete all holes in top plates of horz lid.c/n . 3/9/2001 10:27:01 AM
BLD00-03370 BLD-Energy code compliance3/8/20013/9/20013/9/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 03/08/2001 at 18:16:49. Contact: ###-####.need to complete insulation and recall. 3/9/2001 2:01:21 PM
BLD01-00138 BLD-Framing/Rough-in3/9/20013/9/20013/9/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/09/2001 at 07:46:14. Contact: .ok to cover all but ,bulk head ,const not started at this time. 3/9/2001 1:44:13 PM
MEC01-00681 Pressure Test3/9/20013/9/20013/9/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/09/2001 at 08:10:55. Contact: ###-####.
BLD01-00050 BLD-Final3/9/20013/9/20013/9/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/09/2001 at 09:39:52. Contact: ###-####.ok temp oc,c/n posted patch holes in separation walls./9/2001 4:23:43 PM 3/9/2001 4:24:17 PM