BLD00-01844
| BLD-Framing/Rough-in | 3/8/2001 | 3/9/2001 | 3/9/2001 12:00:00 AM | A | PART |
|
|
###-####
c/n still pending, insulation ok, ok to sheet rock unaffected areas 3/9/2001 11:24:31 AM
|
BLD01-00189
| BLD-Framing/Rough-in | 3/8/2001 | 3/9/2001 | 3/9/2001 12:00:00 AM | A | PART |
|
|
Dave Miller ###-####
need wall bracing completed, screw both sides of studs, ok to cover 3/9/2001 10:32:29 AM
|
BLD01-00319
| BLD-Final | 3/8/2001 | 3/9/2001 | 3/9/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/08/2001 at 14:57:22. Contact: ###-####.
c/n posted written on approved plans, verify framing inspection or verify bracing, entry door and smoke seal, hardware, trade sign offs 3/9/2001 10:28:54 AM
|
BLD00-01550
| BLD-Final | 3/9/2001 | 3/9/2001 | 3/9/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/09/2001 at 11:00:52. Contact: ###-####.
need bond for landscape or finish per plan, no formal inspection made 3/12/2001 11:16:40 AM
|
BLD01-00258
| BLD-Framing/Rough-in | 3/8/2001 | 3/9/2001 | 3/9/2001 12:00:00 AM | P | PART |
|
|
###-####
ok to cover main floor remodel, need to change out egress window frames to pressure treat down stairs,,, addition framing to come later 3/9/2001 2:22:31 PM
|
MEC01-00108
| Final | 3/8/2001 | 3/9/2001 | 3/9/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/08/2001 at 14:19:15. Contact: ###-####.
c/n posted 3/9/2001 3:18:06 PM
|
MEC01-00109
| Final | 3/8/2001 | 3/9/2001 | 3/9/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/08/2001 at 14:20:22. Contact: ###-####.
c/n posted 3/9/2001 3:17:48 PM
|