Inspections for the day of: Wednesday, March 9, 2005.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC05-00737 Pressure Test3/8/20053/9/20053/9/2005 12:00:00 AMAPASS
patrick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD05-00150 BLD-Energy code compliance3/8/20053/9/20053/9/2005 12:00:00 AMAPASS
todd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD04-02364 BLD-Framing/Rough-in3/9/20053/9/20053/9/2005 12:00:00 AMAPASS
Please inspect later in the AM if possable...Thanks; Phone #: ###-#### Internet Inspection Request from: Ken Litzinger
BLD03-02787 BLD-Final3/9/20053/9/20053/9/2005 12:00:00 AMPPASS
brian ###-#### C/C issued. 3/9/2005 2:57:34 PM
BLD05-00083 BLD-Energy code compliance3/9/20053/9/20053/9/2005 12:00:00 AMPPASS
verl; Phone #: ###-#### Internet Inspection Request from: Barbara Moore S on Thomas (across from Franklin Bldg Supply.....all the way to the end. 3/9/2005 3:16:07 PM
BLD04-00640 BLD-Framing/Rough-in3/9/20053/9/20053/9/2005 12:00:00 AMPFAIL
for fire shaft-- bruce; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need to complete fire taping in shafts...... 3/9/2005 5:27:55 PM
BLD04-02966 BLD-Conference3/9/20053/9/20053/9/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/9/2005 at 10:02:19 AM. Contact: ###-####.
BLD05-00179 BLD-Framing/Rough-in3/9/20053/9/20053/9/2005 12:00:00 AMPPASS
larry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Frame and Energy OK. 3/9/2005 2:56:39 PM