Inspections for the day of: Wednesday, March 9, 2005.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRon Ginner
TitlePLM-INSPECTOR
Phone #794-9485
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM05-00595 Plumbing Rough-in3/9/20053/9/20053/10/2005 12:00:00 AMPPART
informed plumber to change pvc couplings to shielded couplings. has abs glued to pvc with all pupose glue in master bath lavs.
MIS05-00027 BLD-Conference3/9/20053/9/20053/10/2005 12:00:00 AMPCANC
PLM05-00589 Groundwork3/8/20053/9/20053/9/2005 12:00:00 AMAPASS
per Lyle. by lisa; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
PLM05-00636 Groundwork3/8/20053/9/20053/9/2005 12:00:00 AMAPASS
david ###-####
PLM05-00595 Plumbing Rough-in3/8/20053/9/20053/9/2005 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 3/8/2005 at 10:18:40 PM. Contact: ###-####.
PLM05-00581 Plumbing Rough-in3/9/20053/9/20053/9/2005 12:00:00 AMPPASS
pinnacle plumbing ###-#### inspection passed. 2 ferncos need replaced in open lath wall. notified sean at pinnacle to replace with shielded couplings. 3/9/2005 9:28:12 AM
PLM05-00639 Water and/or Sewer3/9/20053/9/20053/9/2005 12:00:00 AMPPASS
dan ###-####
PLM04-02738 Final3/9/20053/9/20053/9/2005 12:00:00 AMPPASS
per Jim M. by Lisa; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel plumbing complete. norco finishing on med gas and paperwork for med gas needs to be finished. 3/9/2005 3:39:19 PM
PLM05-00209 Final3/9/20053/9/20053/9/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/9/2005 at 9:31:35 AM. Contact: ###-####.
PLM05-00622 Plumbing Rough-in3/9/20053/9/20053/9/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/9/2005 at 9:51:41 AM. Contact: ###-####.
PLM05-00516 Plumbing Rough-in3/9/20053/9/20053/9/2005 12:00:00 AMPPASS
You beat our test guy out this morning. He should have gotten it fixed later this AM. Sorry! Mary Jane; Phone #: ###-#### Internet Inspection Request from: Kim Alderson
PLM05-00631 Groundwork3/8/20053/9/20053/9/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/8/2005 at 2:38:19 PM. Contact: ###-####.
MIS05-00027 BLD-Conference3/3/20053/9/20053/9/2005 12:00:00 AMPCANC