BLD06-02401
| FIRE-Final Inspection | 3/8/2007 | 3/9/2007 | 3/12/2007 11:12:30 AM | P | PART |
|
|
Items on correction notice issued at the previous inspection on 3/7 have been verified for compliance. Agreed to proceed with the terms of the agreements outlined at the on site meeting on 2/16 for temp. storage of the PODS.
|
FIR06-00396
| INSP-Final Inspection | 3/9/2007 | 3/9/2007 | 3/12/2007 11:05:08 AM | P | PASS |
|
|
Final sprinkler inspection passed, noted missing ceiling tile at one location in front of the womens restroom to be installed today per Sam of Unico.
|
FIR06-00595
| INSP-Alarm Testing | 3/7/2007 | 3/9/2007 | 3/12/2007 11:01:47 AM | A | FAIL |
|
|
Inspection for the 5th floor Office supply tenant alarm work failed due to non-functional speakers at several locations, two SD have incorrect descriptors, as-built plans should reflect field changes, the notification and initiation devices at the north hall are not installed at this time. Also verified added SS at the mech. penthouse. Attempted test of the 1st floor atrium doors failed due to non-functional manual pull station at the reception desk.
|
FIR07-00162
| INSP-Final Inspection | 3/8/2007 | 3/9/2007 | 3/9/2007 11:31:10 AM | A | PASS |
|
|
Fire sprinkler permit finaled.
|
BLD06-03623
| FIRE-Final Inspection | 3/8/2007 | 3/9/2007 | 3/9/2007 11:30:05 AM | A | PASS |
|
|
c/n items are compliant, fire life safety passed.
|
FIR06-00976
| INSP-Final Inspection | 3/8/2007 | 3/9/2007 | 3/9/2007 11:28:42 AM | A | PASS |
|
|
Final fire sprinkler permit work inspection is satisfactory, permit finaled.
|
FIR06-00101
| INSP-Sprinkler Rough-in/Hydro | 3/8/2007 | 3/9/2007 | 3/9/2007 11:26:21 AM | A | FAIL |
|
|
Correction notice items from the previous inspection for the antifreeze system completed on 2/27/07 are not complete, also noted to contractor some items still in need of completion including OH floors 1-4 and UG supply hydro tests, missing heads in the gravity chute, and remaining OH inspections.
|