ESC05-01748
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 10:18:25 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC05-01746
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 10:18:04 AM | P | PASS |
|
|
Final stablization has been completed.
|
ESC06-01853
| Complaint Inspection | 3/9/2007 | 3/9/2007 | 3/9/2007 10:05:18 AM | P | PASS |
|
|
Site looks okay. Talked to RP about watching trackout on sidewalks and in gutters. Sidewalks are being poured today and I reminded the RP about watching concrete washout by disposing of it appropriately.
|
ESC06-01851
| Complaint Inspection | 3/9/2007 | 3/9/2007 | 3/9/2007 10:04:58 AM | P | PASS |
|
|
Site looks okay. Talked to RP about watching trackout on sidewalks and in gutters. Sidewalks are being poured today and I reminded the RP about watching concrete washout by disposing of it appropriately.
|
ESC06-01850
| Complaint Inspection | 3/9/2007 | 3/9/2007 | 3/9/2007 10:04:35 AM | P | PASS |
|
|
Site looks okay. Talked to RP about watching trackout on sidewalks and in gutters. Sidewalks are being poured today and I reminded the RP about watching concrete washout by disposing of it appropriately.
|
ESC06-01848
| Complaint Inspection | 3/9/2007 | 3/9/2007 | 3/9/2007 10:04:21 AM | P | PASS |
|
|
Site looks okay. Talked to RP about watching trackout on sidewalks and in gutters. Sidewalks are being poured today and I reminded the RP about watching concrete washout by disposing of it appropriately.
|
ESC06-00630
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 10:02:44 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC05-01218
| BMP Violation | 3/7/2007 | 3/9/2007 | 3/9/2007 10:02:17 AM | A | PASS |
|
|
Site looks better. Talked to RP about watching trackout and keeping up on trash. d/i protection has been installed.
|
ESC05-01209
| BMP Violation | 3/7/2007 | 3/9/2007 | 3/9/2007 10:02:02 AM | A | PASS |
|
|
Site looks better. Talked to RP about watching trackout and keeping up on trash. d/i protection has been installed.
|
ESC05-01741
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 9:23:59 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC05-01924
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 9:23:38 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC05-01740
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 9:23:16 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC05-00996
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 9:22:59 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC05-00995
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 9:09:56 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC03-00549
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 9:08:46 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC03-00550
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 9:06:37 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC04-00565
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 9:05:01 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC04-00356
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 9:02:55 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC06-00039
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 9:02:05 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC05-01666
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 8:59:52 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC06-00038
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 8:59:25 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC07-00067
| Complaint Inspection | 3/9/2007 | 3/9/2007 | 3/9/2007 8:33:00 AM | P | PART |
|
|
Responded to citizen complaint regarding trackout and concrete trucks washing chutes out into gutter. Met with excavator this morning and saw no evidence of concrete residue in streets or in gutters. Footings were poured three days ago and backfilling is being completed and utility work being done. Stree will be swept today and trackout will be maintained throughout construction phase. All ESC signs are posted. Contacted RP and complainant about inspection and findings. Will reinspect site for MEP.
|
ESC07-00066
| Complaint Inspection | 3/9/2007 | 3/9/2007 | 3/9/2007 8:32:49 AM | P | PART |
|
|
Responded to citizen complaint regarding trackout and concrete trucks washing chutes out into gutter. Met with excavator this morning and saw no evidence of concrete residue in streets or in gutters. Footings were poured three days ago and backfilling is being completed and utility work being done. Stree will be swept today and trackout will be maintained throughout construction phase. All ESC signs are posted. Contacted RP and complainant about inspection and findings. Will reinspect site for MEP.
|
ESC06-01690
| Complaint Inspection | 3/9/2007 | 3/9/2007 | 3/9/2007 8:32:31 AM | P | PART |
|
|
Responded to citizen complaint regarding trackout and concrete trucks washing chutes out into gutter. Met with excavator this morning and saw no evidence of concrete residue in streets or in gutters. Footings were poured three days ago and backfilling is being completed and utility work being done. Stree will be swept today and trackout will be maintained throughout construction phase. All ESC signs are posted. Contacted RP and complainant about inspection and findings. Will reinspect site for MEP.
|
ESC03-00699
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 8:29:34 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC06-01845
| Site Final | 3/9/2007 | 3/9/2007 | 3/9/2007 8:29:06 AM | P | PASS |
|
|
Final stabilization has been completed.
|