BLD08-02150
| BLD-Final | 3/3/2009 | 3/9/2009 | 3/10/2009 11:47:21 AM | P | CANC |
|
|
everett Phone #: ###-#### c/n by fire. call from fire to wait for c/n to be done before bld final can occur.
|
BLD08-00789
| BLD-Conference | 3/9/2009 | 3/9/2009 | 3/9/2009 3:13:56 PM | P | PASS |
|
|
reviewed handrail ok to have one rail to landing. two risers from landing to bonus rm. handrail not required/ shape and size of handrail tubing ok for const. back door of garage needs to swing our or need landing in the garage for door swinging over landing to exstend.
|
BLD08-01341
| DOC - Permit Finaled | 3/9/2009 | 3/9/2009 | 3/9/2009 3:07:58 PM | P | PASS |
|
|
|
BLD06-01540
| BLD-Final | 3/6/2009 | 3/9/2009 | 3/9/2009 2:52:42 PM | A | PASS |
|
|
Pat ###-####
|
BLD06-01540
| DOC - Permit Finaled | 3/9/2009 | 3/9/2009 | 3/9/2009 2:52:08 PM | P | PASS |
|
|
|
BLD08-02361
| BLD-Final | 3/9/2009 | 3/9/2009 | 3/9/2009 1:55:56 PM | P | PASS |
|
|
final ok l/c isued
|
BLD08-02361
| DOC - Permit Finaled | 3/9/2009 | 3/9/2009 | 3/9/2009 1:55:30 PM | P | PASS |
|
|
|
BLD09-00138
| BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 11:17:35 AM | A | PASS |
|
|
John ###-#### framing ok insulation ok / pending plm aprovals
|
BLD09-00221
| BLD-Foundation | 3/6/2009 | 3/9/2009 | 3/9/2009 10:25:24 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 3/6/2009 at 10:27:39 AM. Contact: ###-####.
|
ESC09-00075
| Random Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 10:25:09 AM | A | PART |
|
|
clean out pit in place sign on order.
|
BLD08-02051
| BLD-Conference | 3/6/2009 | 3/9/2009 | 3/9/2009 10:23:10 AM | A | PASS |
|
|
michael Phone #: ###-####
|
ESC08-00819
| Random Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 10:22:55 AM | A | PASS |
|
|
very clean site
|