Inspections for the day of: Monday, March 9, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00018 INSP-Sprinkler Rough-in/Hydro3/9/20093/9/20093/10/2009 8:12:22 AMPDEFR
See comments per T. Frost
FIR07-01051 INSP-Sprinkler Rough-in3/6/20093/9/20093/9/2009 4:47:05 PMPPART
Rough-in inspection completed for the south gym (two covered heads and missing head guards), reinspection okayed for the office area defficiencies, band and choir rooms approved for cover, noted one overspaced head at the NE classroom wing common corridor, see plans for circled areas with today's date for locations okayed, main cpl. above the sheetrock ceiling at the band practice room to be repaired.
FIR08-00786 FIR-Aging Inspection3/9/20093/9/20093/9/2009 4:35:59 PM DONE
Site visit confirmed construction underway, work in progress.
FIR08-00574 INSP-Final Inspection3/9/20093/9/20093/9/2009 4:35:12 PMPPASS
Fire alarm permit okay for finaled status.
BLD08-01126 FIRE-Final Inspection3/9/20093/9/20093/9/2009 4:34:16 PMPFAIL
Noted missing exit signage and emergency lighting, door hardware needs switched at one location.
BLD07-01654 FIRE-Final Inspection3/5/20093/9/20093/9/2009 4:32:36 PMAPASS
Final fire life safety walkthrough passed.
FIR08-00039 INSP-Final Inspection3/9/20093/9/20093/9/2009 4:31:42 PMPPASS
Corrections completed, fire sprinkler permit finaled.
BLD08-02150 FIRE-Final Inspection3/3/20093/9/20093/9/2009 4:30:25 PMAFAIL
See correction notice on site for list of items to be repaired including door hardware at the main entry/exit, hardware at the restroom vestibule, hardware at the door from the process bay to the cleaning room, need to provide exit signage and EM lighting including the exit discharge per plan annotations and fire code review notes.