FIR08-00018
| INSP-Sprinkler Rough-in/Hydro | 3/9/2009 | 3/9/2009 | 3/10/2009 8:12:22 AM | P | DEFR |
|
|
See comments per T. Frost
|
FIR07-01051
| INSP-Sprinkler Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 4:47:05 PM | P | PART |
|
|
Rough-in inspection completed for the south gym (two covered heads and missing head guards), reinspection okayed for the office area defficiencies, band and choir rooms approved for cover, noted one overspaced head at the NE classroom wing common corridor, see plans for circled areas with today's date for locations okayed, main cpl. above the sheetrock ceiling at the band practice room to be repaired.
|
FIR08-00786
| FIR-Aging Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 4:35:59 PM | | DONE |
|
|
Site visit confirmed construction underway, work in progress.
|
FIR08-00574
| INSP-Final Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 4:35:12 PM | P | PASS |
|
|
Fire alarm permit okay for finaled status.
|
BLD08-01126
| FIRE-Final Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 4:34:16 PM | P | FAIL |
|
|
Noted missing exit signage and emergency lighting, door hardware needs switched at one location.
|
BLD07-01654
| FIRE-Final Inspection | 3/5/2009 | 3/9/2009 | 3/9/2009 4:32:36 PM | A | PASS |
|
|
Final fire life safety walkthrough passed.
|
FIR08-00039
| INSP-Final Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 4:31:42 PM | P | PASS |
|
|
Corrections completed, fire sprinkler permit finaled.
|
BLD08-02150
| FIRE-Final Inspection | 3/3/2009 | 3/9/2009 | 3/9/2009 4:30:25 PM | A | FAIL |
|
|
See correction notice on site for list of items to be repaired including door hardware at the main entry/exit, hardware at the restroom vestibule, hardware at the door from the process bay to the cleaning room, need to provide exit signage and EM lighting including the exit discharge per plan annotations and fire code review notes.
|