FIR06-00108
| FIR-Aging Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 4:23:03 PM | P | NR |
|
|
I spoke to jeff and he stated that he would follow up on the status of the project and get back to me.
|
FIR00-00501
| INSP-Conference | 3/9/2009 | 3/9/2009 | 3/9/2009 4:22:10 PM | P | DONE |
|
|
I spoke to keith about the need to get this permit inspected and finaled. He stated that he would follow up.
|
FIR08-00675
| INSP-Sprinkler Rough-in | 3/9/2009 | 3/9/2009 | 3/9/2009 2:30:19 PM | P | PASS |
|
|
The sprinkler piping above the ceiling in the third floor central stair tower is ok to cover.
|
FIR08-00675
| INSP-Supply line flush | 3/4/2009 | 3/9/2009 | 3/9/2009 2:28:23 PM | P | PASS |
|
|
The underground flush passed.
|
BLD08-01439
| FIRE-Final Inspection | 3/6/2009 | 3/9/2009 | 3/9/2009 2:27:39 PM | A | FAIL |
|
|
Contractor was not available for the inspection and there was no access to inside of the building.
|