BLD08-02193
| BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 7:43:52 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 3/9/2009 at 7:00:02 AM. Contact: ###-####.
|
BLD08-02191
| BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 7:43:43 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 3/9/2009 at 6:57:37 AM. Contact: ###-####.
|
BLD08-02192
| BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 7:43:34 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 3/9/2009 at 6:59:17 AM. Contact: ###-####.
|
BLD08-02190
| BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 7:43:22 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 3/9/2009 at 6:56:55 AM. Contact: ###-####.
|
BLD08-02185
| BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 7:43:13 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 3/9/2009 at 6:56:17 AM. Contact: ###-####.
|
BLD08-02183
| BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 7:43:04 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 3/9/2009 at 6:54:43 AM. Contact: ###-####.
|
BLD08-02182
| BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 7:42:55 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 3/9/2009 at 6:52:46 AM. Contact: ###-####.
|
BLD08-02207
| BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 7:42:46 AM | P | CANC |
|
|
Jim Phone #: ###-####
|
BLD08-02206
| BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 7:42:30 AM | P | CANC |
|
|
Jim Phone #: ###-####
|
BLD08-02205
| BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 7:42:18 AM | P | CANC |
|
|
Jim Phone #: ###-####
|
BLD08-02201
| BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 7:41:57 AM | P | PASS |
|
|
Nailing for both layers of 5/8 type x rock from ceilng to underside of roof deck. Also verified fire rated plywood for laydown parapet at overbuild areas.
|
BLD08-02202
| BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 7:38:41 AM | P | PASS |
|
|
Nailing for both layers of 5/8 type x rock from ceiling to underside of roof deck. Also verified fire rated plywood for laydown parapet at overbuild areas.
|
BLD08-02203
| BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 7:36:17 AM | P | PASS |
|
|
Naling for both layers of 5/8 type x rock from ceiling to underside of roof deck. Also verified fire rated plywood for laydown parapet at overbuild ares.
|
BLD08-02204
| BLD-Framing/Rough-in | 3/9/2009 | 3/9/2009 | 3/10/2009 7:34:54 AM | P | PASS |
|
|
Nailing for both layers of 5/8 type x rock from ceiling to under side of roof deck. Also verified fire rated plywood at laydown paraper at overbuild areas.
|
BLD08-02184
| BLD-Footing | 3/9/2009 | 3/9/2009 | 3/9/2009 2:02:12 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 3/9/2009 at 6:55:39 AM. Contact: ###-####.
|
MIS09-00028
| BLD-Conference | 3/9/2009 | 3/9/2009 | 3/9/2009 1:45:03 PM | P | FAIL |
|
|
This is for a home purchase. Please contact Jeff Dildine for access at least 1/2 hour before arriving. Thank you! Phone #: ###-#### Internet Inspection Request from: Connie LaFrainer. Install smoke detectos, gFI in kitchen and needs to scrape and paint siding in backyard.
|
BLD08-02186
| BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 11:47:23 AM | A | NR |
|
|
Jim Phone #: ###-####
|
BLD08-02182
| BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 11:47:06 AM | A | NR |
|
|
Jim Phone #: ###-####
|
BLD08-02183
| BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 11:46:51 AM | A | NR |
|
|
Jim Phone #: ###-####
|
BLD08-02184
| BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 11:46:37 AM | A | NR |
|
|
Jim Phone #: ###-####
|
BLD08-02185
| BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 11:46:21 AM | A | NR |
|
|
Jim Phone #: ###-####
|
ESC08-00880
| Random Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 11:05:36 AM | A | PASS |
|
|
|
BLD08-02190
| BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 11:05:16 AM | A | NR |
|
|
Jim Phone #: ###-####
|
ESC08-00881
| Random Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 11:04:17 AM | A | PASS |
|
|
|
BLD08-02192
| BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 11:03:59 AM | A | NR |
|
|
Jim Phone #: ###-####
|
ESC08-00882
| Random Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 11:03:05 AM | A | PASS |
|
|
|
BLD08-02191
| BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 11:02:40 AM | A | PASS |
|
|
Jim Phone #: ###-#### 1st. floor, 2nd. layer of 5/8 type x rock, both sides for 2hr. fire wall.
|
ESC08-00883
| Random Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 11:00:50 AM | A | PASS |
|
|
|
BLD08-02193
| BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 11:00:28 AM | A | PASS |
|
|
Jim Phone #: ###-####. 1st. floor, 2nd. layer of 5/8 typex rock bothsides for 2hr. fire wall.
|
ESC08-00877
| Random Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 10:51:08 AM | A | PASS |
|
|
|
BLD08-02187
| BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 10:33:52 AM | A | PASS |
|
|
Jim Phone #: ###-####. NAiling on both layers of 5/8 type x rock from2nd. floor ceiling to underside of roof deck, both sides. Also verified fire rated plywood for laydown parapet at overbuild areas.
|
ESC08-00878
| Random Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 10:31:38 AM | A | PASS |
|
|
|
BLD08-02188
| BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 10:31:10 AM | A | PASS |
|
|
Jim Phone #: ###-####. Nailing on both layers of 5/8 type x rock from 2nd. floor ceiling to under side of roof deck, both sides. Also verified fire rated plywood on laydown parapets at overbuild areas.
|
ESC08-00879
| Random Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 10:27:52 AM | A | PASS |
|
|
|
BLD08-02189
| BLD-Framing/Rough-in | 3/6/2009 | 3/9/2009 | 3/9/2009 10:27:19 AM | A | PASS |
|
|
Jim Phone #: ###-####. Verified nailing, both layers of 5/8 type x rock from 2nd. floor ceiling to underside of roof deck, both sides. Also verfied installation of fire rated plywood for laydown parapets at overbuild a areas.
|
ESC08-00901
| BMP Violation | 3/9/2009 | 3/9/2009 | 3/9/2009 10:22:13 AM | A | PASS |
|
|
All const. debries have been cleaned up.
|
BLD08-02207
| BLD-Energy code compliance | 3/6/2009 | 3/9/2009 | 3/9/2009 10:21:37 AM | A | PASS |
|
|
Jim Phone #: ###-####. ok to rock.
|
ESC08-00900
| BMP Violation | 3/9/2009 | 3/9/2009 | 3/9/2009 10:20:40 AM | A | PASS |
|
|
All const. debries have been cleaned up.
|
BLD08-02206
| BLD-Energy code compliance | 3/6/2009 | 3/9/2009 | 3/9/2009 10:19:51 AM | A | PASS |
|
|
Jim Phone #: ###-####. ok to rock.
|
ESC08-00899
| BMP Violation | 3/9/2009 | 3/9/2009 | 3/9/2009 10:18:09 AM | A | PASS |
|
|
All const. debries have been cleaned up.
|
BLD08-02205
| BLD-Energy code compliance | 3/6/2009 | 3/9/2009 | 3/9/2009 10:17:29 AM | A | PASS |
|
|
Jim Phone #: ###-####. ok to rock.
|