Inspections for the day of: Monday, March 9, 2009.
Number of inspections: 41
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-02193 BLD-Framing/Rough-in3/9/20093/9/20093/10/2009 7:43:52 AMPCANC
Scheduled by a contractor via Hello! on 3/9/2009 at 7:00:02 AM. Contact: ###-####.
BLD08-02191 BLD-Framing/Rough-in3/9/20093/9/20093/10/2009 7:43:43 AMPCANC
Scheduled by a contractor via Hello! on 3/9/2009 at 6:57:37 AM. Contact: ###-####.
BLD08-02192 BLD-Framing/Rough-in3/9/20093/9/20093/10/2009 7:43:34 AMPCANC
Scheduled by a contractor via Hello! on 3/9/2009 at 6:59:17 AM. Contact: ###-####.
BLD08-02190 BLD-Framing/Rough-in3/9/20093/9/20093/10/2009 7:43:22 AMPCANC
Scheduled by a contractor via Hello! on 3/9/2009 at 6:56:55 AM. Contact: ###-####.
BLD08-02185 BLD-Framing/Rough-in3/9/20093/9/20093/10/2009 7:43:13 AMPCANC
Scheduled by a contractor via Hello! on 3/9/2009 at 6:56:17 AM. Contact: ###-####.
BLD08-02183 BLD-Framing/Rough-in3/9/20093/9/20093/10/2009 7:43:04 AMPCANC
Scheduled by a contractor via Hello! on 3/9/2009 at 6:54:43 AM. Contact: ###-####.
BLD08-02182 BLD-Framing/Rough-in3/9/20093/9/20093/10/2009 7:42:55 AMPCANC
Scheduled by a contractor via Hello! on 3/9/2009 at 6:52:46 AM. Contact: ###-####.
BLD08-02207 BLD-Framing/Rough-in3/9/20093/9/20093/10/2009 7:42:46 AMPCANC
Jim Phone #: ###-####
BLD08-02206 BLD-Framing/Rough-in3/9/20093/9/20093/10/2009 7:42:30 AMPCANC
Jim Phone #: ###-####
BLD08-02205 BLD-Framing/Rough-in3/9/20093/9/20093/10/2009 7:42:18 AMPCANC
Jim Phone #: ###-####
BLD08-02201 BLD-Framing/Rough-in3/9/20093/9/20093/10/2009 7:41:57 AMPPASS
Nailing for both layers of 5/8 type x rock from ceilng to underside of roof deck. Also verified fire rated plywood for laydown parapet at overbuild areas.
BLD08-02202 BLD-Framing/Rough-in3/9/20093/9/20093/10/2009 7:38:41 AMPPASS
Nailing for both layers of 5/8 type x rock from ceiling to underside of roof deck. Also verified fire rated plywood for laydown parapet at overbuild areas.
BLD08-02203 BLD-Framing/Rough-in3/9/20093/9/20093/10/2009 7:36:17 AMPPASS
Naling for both layers of 5/8 type x rock from ceiling to underside of roof deck. Also verified fire rated plywood for laydown parapet at overbuild ares.
BLD08-02204 BLD-Framing/Rough-in3/9/20093/9/20093/10/2009 7:34:54 AMPPASS
Nailing for both layers of 5/8 type x rock from ceiling to under side of roof deck. Also verified fire rated plywood at laydown paraper at overbuild areas.
BLD08-02184 BLD-Footing3/9/20093/9/20093/9/2009 2:02:12 PMPCANC
Scheduled by a contractor via Hello! on 3/9/2009 at 6:55:39 AM. Contact: ###-####.
MIS09-00028 BLD-Conference3/9/20093/9/20093/9/2009 1:45:03 PMPFAIL
This is for a home purchase. Please contact Jeff Dildine for access at least 1/2 hour before arriving. Thank you! Phone #: ###-#### Internet Inspection Request from: Connie LaFrainer. Install smoke detectos, gFI in kitchen and needs to scrape and paint siding in backyard.
BLD08-02186 BLD-Framing/Rough-in3/6/20093/9/20093/9/2009 11:47:23 AMANR
Jim Phone #: ###-####
BLD08-02182 BLD-Framing/Rough-in3/6/20093/9/20093/9/2009 11:47:06 AMANR
Jim Phone #: ###-####
BLD08-02183 BLD-Framing/Rough-in3/6/20093/9/20093/9/2009 11:46:51 AMANR
Jim Phone #: ###-####
BLD08-02184 BLD-Framing/Rough-in3/6/20093/9/20093/9/2009 11:46:37 AMANR
Jim Phone #: ###-####
BLD08-02185 BLD-Framing/Rough-in3/6/20093/9/20093/9/2009 11:46:21 AMANR
Jim Phone #: ###-####
ESC08-00880 Random Inspection3/9/20093/9/20093/9/2009 11:05:36 AMAPASS
BLD08-02190 BLD-Framing/Rough-in3/6/20093/9/20093/9/2009 11:05:16 AMANR
Jim Phone #: ###-####
ESC08-00881 Random Inspection3/9/20093/9/20093/9/2009 11:04:17 AMAPASS
BLD08-02192 BLD-Framing/Rough-in3/6/20093/9/20093/9/2009 11:03:59 AMANR
Jim Phone #: ###-####
ESC08-00882 Random Inspection3/9/20093/9/20093/9/2009 11:03:05 AMAPASS
BLD08-02191 BLD-Framing/Rough-in3/6/20093/9/20093/9/2009 11:02:40 AMAPASS
Jim Phone #: ###-#### 1st. floor, 2nd. layer of 5/8 type x rock, both sides for 2hr. fire wall.
ESC08-00883 Random Inspection3/9/20093/9/20093/9/2009 11:00:50 AMAPASS
BLD08-02193 BLD-Framing/Rough-in3/6/20093/9/20093/9/2009 11:00:28 AMAPASS
Jim Phone #: ###-####. 1st. floor, 2nd. layer of 5/8 typex rock bothsides for 2hr. fire wall.
ESC08-00877 Random Inspection3/9/20093/9/20093/9/2009 10:51:08 AMAPASS
BLD08-02187 BLD-Framing/Rough-in3/6/20093/9/20093/9/2009 10:33:52 AMAPASS
Jim Phone #: ###-####. NAiling on both layers of 5/8 type x rock from2nd. floor ceiling to underside of roof deck, both sides. Also verified fire rated plywood for laydown parapet at overbuild areas.
ESC08-00878 Random Inspection3/9/20093/9/20093/9/2009 10:31:38 AMAPASS
BLD08-02188 BLD-Framing/Rough-in3/6/20093/9/20093/9/2009 10:31:10 AMAPASS
Jim Phone #: ###-####. Nailing on both layers of 5/8 type x rock from 2nd. floor ceiling to under side of roof deck, both sides. Also verified fire rated plywood on laydown parapets at overbuild areas.
ESC08-00879 Random Inspection3/9/20093/9/20093/9/2009 10:27:52 AMAPASS
BLD08-02189 BLD-Framing/Rough-in3/6/20093/9/20093/9/2009 10:27:19 AMAPASS
Jim Phone #: ###-####. Verified nailing, both layers of 5/8 type x rock from 2nd. floor ceiling to underside of roof deck, both sides. Also verfied installation of fire rated plywood for laydown parapets at overbuild a areas.
ESC08-00901 BMP Violation3/9/20093/9/20093/9/2009 10:22:13 AMAPASS
All const. debries have been cleaned up.
BLD08-02207 BLD-Energy code compliance3/6/20093/9/20093/9/2009 10:21:37 AMAPASS
Jim Phone #: ###-####. ok to rock.
ESC08-00900 BMP Violation3/9/20093/9/20093/9/2009 10:20:40 AMAPASS
All const. debries have been cleaned up.
BLD08-02206 BLD-Energy code compliance3/6/20093/9/20093/9/2009 10:19:51 AMAPASS
Jim Phone #: ###-####. ok to rock.
ESC08-00899 BMP Violation3/9/20093/9/20093/9/2009 10:18:09 AMAPASS
All const. debries have been cleaned up.
BLD08-02205 BLD-Energy code compliance3/6/20093/9/20093/9/2009 10:17:29 AMAPASS
Jim Phone #: ###-####. ok to rock.