Inspections for the day of: Tuesday, March 9, 2010.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-02220 FIRE-Final Inspection3/8/20103/9/20103/9/2010 5:27:02 PMPFAIL
Provide approved single action hardware on the secondary front exit and the rear exit as discussed. All other items are ok.
FIR03-00510 FIR-Aging Inspection3/9/20103/9/20103/9/2010 3:19:42 PM NR
Permit information was forwarded to Scott for further action with non responsive contractor.
FIR03-00381 FIR-Aging Inspection3/9/20103/9/20103/9/2010 3:18:58 PM NR
Permit information was forwarded to Scott for further action with non responsive contractor.
FIR08-00636 INSP-Final Inspection3/9/20103/9/20103/9/2010 3:16:59 PMPPASS
Permit finaled.
FIR08-00772 INSP-Final Inspection3/9/20103/9/20103/9/2010 3:04:17 PMPPASS
Permit finaled.
FIR09-00734 INSP-Sprinkler Rough-in3/9/20103/9/20103/9/2010 2:20:37 PMPPASS
The rough-in inspection based on the resubmitted/as-builts passed. We could not gain access to the riser room for an inspection there.
FIR09-00681 INSP-Sprinkler Rough-in3/8/20103/9/20103/9/2010 2:03:33 PMPFAIL
Resubmittals are required due to pipe routing and sizing that differs from the approved plans. One pendant on the second floor needs to be relocated since it exceeds 8' from the kitchen wall. There is shadowing in the second floor bathroom. An additional head will be required or a lintel/soffit installed as discussed.
FIR09-00731 INSP-Final Inspection3/9/20103/9/20103/9/2010 1:22:40 PMPPASS
Permit finaled
FIR09-00731 INSP-Sprinkler Rough-in3/8/20103/9/20103/9/2010 11:54:53 AMAPASS
Permit finaled
BLD09-02174 FIRE-Final Inspection3/8/20103/9/20103/9/2010 10:07:30 AMAPASS