Inspections for the day of: Tuesday, March 9, 2010.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00812 General Inspection3/9/20103/9/20103/9/2010 3:42:35 PMPFAIL
None of the repairs have occured that have been indicated in the pervious inspections. Also have viewed that at the discharge point into the first pond, the clarity has become cloudy. Possibly organics and sediment from scouring of the pond edge at the point of discharge. Have notified the RP of the findings of the inspection. Explained to the RP to contact the ERosion Control Manager over a solution to miniumizescouring at the discharge point. Will keep inspecting on a daily basis.
ESC08-00842 BMP Violation3/8/20103/9/20103/9/2010 3:17:34 PMPCANC
Moved until 3/10/10AM.
ESC10-00031 Conference3/9/20103/9/20103/9/2010 3:16:45 PMADONE
Required The GC to use a dirt bag when dewatering out of the trench. Discharge will hasppen at the grass area above the drainage swales.
ESC09-00539 Random Inspection3/9/20103/9/20103/9/2010 10:07:45 AMAFAIL
Verbal to RP:
Protect storm drain inlet at the access off of Franklin to the West of project area. Willl re-inspect on 3/10/10AM.
ESC10-00110 Site Preparation3/9/20103/9/20103/9/2010 9:43:10 AM FAIL
Verbal to RP:
Clean up all hard surfaces of sediment and debris. Also container all trash debris into the provided trash collection containers. Move the porter pottie off of the sidewalk. Will re-inspect on 3/12/10AM.
ESC10-00106 Site Preparation3/9/20103/9/20103/9/2010 9:42:11 AM PART
Verbal to RP:
Clean up all hard surfaces of sediment and debris. Also container all trash debris into the provided trash collection containers. Will re-inspect on 3/12/10AM.
ESC10-00108 Site Preparation3/9/20103/9/20103/9/2010 9:41:46 AM PART
Verbal to RP:
Clean up all hard surfaces of sediment and debris. Also container all trash debris into the provided trash collection containers. Will re-inspect on 3/12/10AM.
ESC10-00118 Site Final3/9/20103/9/20103/9/2010 9:06:13 AMAPASS
ESC10-00050 General Inspection3/8/20103/9/20103/9/2010 9:05:51 AMAPASS
ESC10-00018 General Inspection3/8/20103/9/20103/9/2010 9:05:42 AMAPASS
ESC10-00103 Site Preparation3/9/20103/9/20103/9/2010 8:31:23 AM PASS
ESC10-00104 Site Preparation3/9/20103/9/20103/9/2010 8:31:16 AM PASS