Inspections for the day of: Wednesday, March 9, 2011.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE10-02662 ELE-Aging Inspection3/9/20113/9/20113/10/2011 1:37:48 PM DONE
see final
ELE10-02555 Conference3/8/20113/9/20113/9/2011 2:55:43 PMPDONE
Brent-Please call at least 30 mins prior to inspection Phone #: ###-#### talked about services for out-buildings and feeder to feed sub-panel
ELE11-00446 Electrical Rough-In3/8/20113/9/20113/9/2011 1:50:47 PMPFAIL
Call 30 minutes before inspection. Phone #: ###-#### >> Inspection requested via web by Don Conley met contractor, left correction notice, NEC 110.26(F)(1)(b) there shall be no foreign systems in dedicated space over panel, check for attic access cable protection, rest should be ok
ELE11-00273 Rough-In Permanent Service3/9/20113/9/20113/9/2011 12:48:28 PMPNR
Phone #: ###-#### >> Inspection requested via web by Therrin Robertson still stapling, make-up, nailplating, water lines over panel, did not count rooms
ELE09-01766 ELE-Aging Inspection3/9/20113/9/20113/9/2011 10:30:59 AM DONE
still under construction
ELE11-00443 Temporary Service3/8/20113/9/20113/9/2011 9:59:07 AMAPASS
Dino ###-#### t/s u/g n ok
ELE11-00318 Electrical Rough-In3/8/20113/9/20113/9/2011 8:54:00 AMAPASS
The owner will be there at 8:00 a.m. to open things up, if it is possible to meet them there then. corrections made, ri ok

Thank you! Phone #: ###-#### >> Inspection requested via web by David McClellan
ELE11-00404 Permanent Service3/8/20113/9/20113/9/2011 8:18:59 AMAPASS
The trailer is locked but there is an on site manager with a key.
Her name is Victoria, she is in #37 and her phone # is ###-####. Phone #: ###-#### >> Inspection requested via web by Craig Korell p/s u/g rec ok