BLD17-00347
| FIRE-Final Inspection | 3/6/2017 | 3/9/2017 | 3/9/2017 3:10:52 PM | A | FAIL |
|
|
Remove the storage in the west warehouse, provide single action lever type hardware on the two exterior exit doors, mount and tag two 4a fire extinguishers as discussed.
|
FIR17-00031
| INSP-Final Inspection | 3/8/2017 | 3/9/2017 | 3/9/2017 2:54:48 PM | A | FAIL |
|
|
Permit can be finaled when the as-builts are approved.
|
FIR16-00811
| INSP-Sprinkler Rough-in | 3/8/2017 | 3/9/2017 | 3/9/2017 1:27:11 PM | P | FAIL |
|
|
Called contact and left voice message. Did not make contact on site. Piping does not appear to meet the minumum 4'-6" bury depth. Missing bury wire and thrust blocks. Not ready for inspeciton. I did not have plans available for inspection.
Brian Collins is the contact for this inspection. He is requesting an underground cover inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Kay Haney
|
FIR16-00601
| INSP-Final Inspection | 3/9/2017 | 3/9/2017 | 3/9/2017 1:14:56 PM | P | PASS |
|
|
Permit finaled
|
BLD16-04524
| FIRE-Conference | 3/8/2017 | 3/9/2017 | 3/9/2017 9:53:53 AM | A | DONE |
|
|
We went over life safety requirements.
|
FIR16-00284
| INSP-Sprinkler Rough-in | 3/8/2017 | 3/9/2017 | 3/9/2017 8:05:06 AM | A | PASS |
|
|
Unit 303 soffit piping is ok to cover.
|