ESC16-00414
| General Inspection | 3/9/2017 | 3/9/2017 | 3/10/2017 1:43:10 PM | | PASS |
|
|
Home complete, occupied, and stabilized. No temporary BMPs remaining. BLD finaled. ESC conditions satisfied.
|
ESC16-00802
| Site Final | 3/9/2017 | 3/9/2017 | 3/9/2017 1:06:34 PM | P | PASS |
|
|
Construction complete and yard landscaped. BLD finaled. No corrections requested. Hickories subdivsion SFHs Clark Homes in compliance.
|
ESC16-00530
| Aging Inspection | 3/9/2017 | 3/9/2017 | 3/9/2017 1:05:49 PM | | PASS |
|
|
WIP. Existing vegetation and driveway preserved for home addition. No corrections needed.
|
ESC16-01550
| General Inspection | 3/3/2017 | 3/9/2017 | 3/9/2017 12:58:12 PM | P | PART |
|
|
provide new ESC permit sign for site
Posted sig new sign on site. No significant trackout, but cleanup will be needed after backfilling foundation..
|
ESC16-00551
| Site Final | 3/9/2017 | 3/9/2017 | 3/9/2017 12:41:49 PM | P | NR |
|
|
Construction complete and landscaping installed.
Correction to get ESC site final:
- remove temporary sediment filter bag from MS4 storm drain drop inlet in front of home.
RP-GC Kent stated he would have BLD finaled and temp DI bag removed before end of month. Will follow up with another site final or BLD inspector may final
|
ESC16-00668
| Site Final | 3/9/2017 | 3/9/2017 | 3/9/2017 12:37:51 PM | P | NR |
|
|
Construction complete and landscaping installed.
Correction to get ESC site final:
- remove temporary sediment filter bag from MS4 storm drain drop inlet in front of home.
|
ESC04-01480
| DOC - Permit Finaled | 3/9/2017 | 3/9/2017 | 3/9/2017 12:35:25 PM | P | PASS |
|
|
old expired permit. work complete, No issues at site,
|
ESC16-00214
| Aging Inspection | 3/9/2017 | 3/9/2017 | 3/9/2017 12:34:36 PM | | PASS |
|
|
Home complete, BLD finaled. No temp BMPs or loose materials on site. ESC permit conditions satisfied.
|
ESC16-00214
| DOC - Permit Finaled | 3/9/2017 | 3/9/2017 | 3/9/2017 12:34:04 PM | P | PASS |
|
|
|
ESC16-01051
| Site Final | 3/9/2017 | 3/9/2017 | 3/9/2017 12:30:26 PM | P | PASS |
|
|
Home complete and landscaped. No corrections needed. ESC permit finaled.
|
ESC16-00797
| DOC - Permit Finaled | 3/9/2017 | 3/9/2017 | 3/9/2017 12:12:03 PM | P | PASS |
|
|
|
ESC16-00522
| Site Final | 3/6/2017 | 3/9/2017 | 3/9/2017 12:05:44 PM | P | PASS |
|
|
Final landscaping near complete. BLD has temp. occupancy and is over 70% stabilized. Site stormwater management is complete and no offisite runoff. ESC permit conditions satisified.
|
ESC16-01459
| General Inspection | 3/8/2017 | 3/9/2017 | 3/9/2017 11:40:03 AM | A | PEND |
|
|
follow up to corrections
No new trackout. Landscping in progress. Inlet has sediment protection.
Note - Chaucer sub needs designated washout pit to prevent dumping and trackout ESC15-00951
|
ESC16-00761
| Aging Inspection | 3/9/2017 | 3/9/2017 | 3/9/2017 10:57:36 AM | | CANC |
|
|
rescheduled for site final anb Belmar check up tomorrow
|
ESC16-00626
| General Inspection | 3/9/2017 | 3/9/2017 | 3/9/2017 10:53:22 AM | P | PASS |
|
|
WIP on second level and in backyard. Large stockpile within backyard. No violations observed
|
ESC16-00812
| Aging Inspection | 3/9/2017 | 3/9/2017 | 3/9/2017 10:49:16 AM | | PASS |
|
|
WIP. Project has resubmittal plans in review currently. Driveway from previous has still installed as well as vegetative buffer strip. No trackout, discharges or loose trash
|
ESC16-00324
| General Inspection | 3/9/2017 | 3/9/2017 | 3/9/2017 10:07:00 AM | A | PASS |
|
|
Vertical construction and interior work in progress. Site development complete except lanscaping and stabilization. No trackout or discharges from site occuring. Trash contained. No corrections at this time. 4 ESC permits for 4 builiding also issued
|
ESC16-00987
| General Inspection | 3/9/2017 | 3/9/2017 | 3/9/2017 10:02:38 AM | | PASS |
|
|
WIP on Aberdeen apartment phase. 4 buildings with ESC permits and one site development permit ESC16-00324,
No stormwater discharges from site, no trackout. Trash contained in bins. Private onsite stormwater system installed - inlets need sediment protection.
Will check for sweeping and site housekeeping next inspection, no significant issues at this time
|
ESC15-01420
| General Inspection | 2/28/2017 | 3/9/2017 | | P | |
|
|
|