Inspections for the day of: Friday, March 9, 2018.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJames Ady
TitleELE-INSPECTOR
Phone #914-4683
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-00670 Final3/8/20183/9/20183/9/2018 2:27:09 PMPPASS
Inspect panel change-out. I pulled a second permit for the panel change-out. Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta final ok
ELE18-00775 Electrical Rough-In3/8/20183/9/20183/9/2018 1:55:53 PMPPASS
Chad VanOrden is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce misc receps cut in. Ceiling ok to cover. Replaced all receps and switches. test all at final
ELE18-00774 Electrical Rough-In3/8/20183/9/20183/9/2018 1:55:01 PMPPASS
Chad VanOrden is contact. ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Misc receps cut in. Ceiling ok to cover. Replaced receps through out. test all at final
ELE18-00661 Rough-In Permanent Service3/8/20183/9/20183/9/2018 1:32:56 PMPPASS
Inspect underground conduits for electric vehicle charging stations. Location is the parking lot on the east side of Bld. 35. Call Ron upon arrival in the B35 parking lot and I will meet you out there. Shouldn''t need to check in at lobby. Phone #: ###-#### Inspection requested via web by Ron Pontius underground on NE corner of building only ok to cover
ELE18-00807 Final3/2/20183/9/20183/9/2018 12:52:14 PMPPASS
Home owner will be home for access after 12:00 noon . Phone #: ###-#### Inspection requested via web by Jonathan Poot final ok
ELE18-00272 Final3/9/20183/9/20183/9/2018 12:21:56 PMPPASS
Requesting occupancy final. Phone #: ###-#### Inspection requested via web by Kevin Perez partial final only still need cubicals set
ELE18-00909 Electrical Rough-In3/9/20183/9/20183/9/2018 11:38:28 AMPPASS
Soffit Phone #: ###-#### Inspection requested via web by danny perrine soffits only ok to cover
ELE18-00856 Final3/9/20183/9/20183/9/2018 10:49:18 AMPPASS
Solar Disc final. Final ok
ELE18-00831 Electrical Rough-In3/9/20183/9/20183/9/2018 10:49:03 AMPPASS
We will call to meet you onsite. Phone #: ###-#### Inspection requested via web by Jesse Simpson UL only ok
ELE18-00831 Final3/9/20183/9/20183/9/2018 10:48:56 AMPPASS
We will call to meet you onsite. Phone #: ###-#### Inspection requested via web by Jesse Simpson Final ok
ELE18-00894 Temporary Service3/8/20183/9/20183/9/2018 10:48:09 AMAPASS
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
ELE18-00885 Conference3/8/20183/9/20183/9/2018 10:24:58 AMADONE
Please call 30 minuets before so I can meet you and do a walk th Phone #: ###-#### Inspection requested via web by danny perrine Talked about splicing wires above panel. Tamper receps, AFCI and addressing damaged wires in burn areas.
ELE18-00886 Electrical Rough-In3/8/20183/9/20183/9/2018 9:30:28 AMAPASS
please call 1 hour ahead to meet on site ###-####. thank you. Phone #: ###-#### Inspection requested via web by Vitaliy Berezin Meeting room will require floor recep as per 210.71. Will be there before final. Meeting room and Breakfast prep room only ok to cover
ELE17-04181 Final3/8/20183/9/20183/9/2018 9:00:07 AMAPASS
garage code 1905 Phone #: ###-#### Inspection requested via web by kevin blackmon final ok