ELE18-00670
| Final | 3/8/2018 | 3/9/2018 | 3/9/2018 2:27:09 PM | P | PASS |
|
|
Inspect panel change-out. I pulled a second permit for the panel change-out. Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta final ok
|
ELE18-00775
| Electrical Rough-In | 3/8/2018 | 3/9/2018 | 3/9/2018 1:55:53 PM | P | PASS |
|
|
Chad VanOrden is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce misc receps cut in. Ceiling ok to cover. Replaced all receps and switches. test all at final
|
ELE18-00774
| Electrical Rough-In | 3/8/2018 | 3/9/2018 | 3/9/2018 1:55:01 PM | P | PASS |
|
|
Chad VanOrden is contact. ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Misc receps cut in. Ceiling ok to cover. Replaced receps through out. test all at final
|
ELE18-00661
| Rough-In Permanent Service | 3/8/2018 | 3/9/2018 | 3/9/2018 1:32:56 PM | P | PASS |
|
|
Inspect underground conduits for electric vehicle charging stations. Location is the parking lot on the east side of Bld. 35. Call Ron upon arrival in the B35 parking lot and I will meet you out there. Shouldn''t need to check in at lobby. Phone #: ###-#### Inspection requested via web by Ron Pontius underground on NE corner of building only ok to cover
|
ELE18-00807
| Final | 3/2/2018 | 3/9/2018 | 3/9/2018 12:52:14 PM | P | PASS |
|
|
Home owner will be home for access after 12:00 noon . Phone #: ###-#### Inspection requested via web by Jonathan Poot final ok
|
ELE18-00272
| Final | 3/9/2018 | 3/9/2018 | 3/9/2018 12:21:56 PM | P | PASS |
|
|
Requesting occupancy final. Phone #: ###-#### Inspection requested via web by Kevin Perez partial final only still need cubicals set
|
ELE18-00909
| Electrical Rough-In | 3/9/2018 | 3/9/2018 | 3/9/2018 11:38:28 AM | P | PASS |
|
|
Soffit Phone #: ###-#### Inspection requested via web by danny perrine soffits only ok to cover
|
ELE18-00856
| Final | 3/9/2018 | 3/9/2018 | 3/9/2018 10:49:18 AM | P | PASS |
|
|
Solar Disc final. Final ok
|
ELE18-00831
| Electrical Rough-In | 3/9/2018 | 3/9/2018 | 3/9/2018 10:49:03 AM | P | PASS |
|
|
We will call to meet you onsite. Phone #: ###-#### Inspection requested via web by Jesse Simpson UL only ok
|
ELE18-00831
| Final | 3/9/2018 | 3/9/2018 | 3/9/2018 10:48:56 AM | P | PASS |
|
|
We will call to meet you onsite. Phone #: ###-#### Inspection requested via web by Jesse Simpson Final ok
|
ELE18-00894
| Temporary Service | 3/8/2018 | 3/9/2018 | 3/9/2018 10:48:09 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
|
ELE18-00885
| Conference | 3/8/2018 | 3/9/2018 | 3/9/2018 10:24:58 AM | A | DONE |
|
|
Please call 30 minuets before so I can meet you and do a walk th Phone #: ###-#### Inspection requested via web by danny perrine Talked about splicing wires above panel. Tamper receps, AFCI and addressing damaged wires in burn areas.
|
ELE18-00886
| Electrical Rough-In | 3/8/2018 | 3/9/2018 | 3/9/2018 9:30:28 AM | A | PASS |
|
|
please call 1 hour ahead to meet on site ###-####. thank you. Phone #: ###-#### Inspection requested via web by Vitaliy Berezin Meeting room will require floor recep as per 210.71. Will be there before final. Meeting room and Breakfast prep room only ok to cover
|
ELE17-04181
| Final | 3/8/2018 | 3/9/2018 | 3/9/2018 9:00:07 AM | A | PASS |
|
|
garage code 1905 Phone #: ###-#### Inspection requested via web by kevin blackmon final ok
|