Inspections for the day of: Friday, March 9, 2018.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01232 General Inspection3/9/20183/9/20183/12/2018 4:20:53 PM CANC
ESC17-00028 Site Final3/7/20183/9/20183/12/2018 4:02:18 PMPPASS
enter via Pamela Baker Park.

Work complete for project. No ESC requests or corrections.
ESC17-00260 Site Final3/9/20183/9/20183/12/2018 10:43:38 AMPPASS
Work complete on warehouse. No temp BMPs in MS4. Area behind warehouse is construction material staging area and is unpaved per scope of project.
ESC16-01612 General Inspection3/9/20183/9/20183/9/2018 4:19:54 PM CANC
ESC16-00990 General Inspection3/9/20183/9/20183/9/2018 4:19:17 PM CANC
ESC17-00395 Conference3/9/20183/9/20183/9/2018 10:35:01 AMPPASS
10 AM site walk through with RP Dean

All corrections have been completed.
- gutter and sidewalk broom swept.
- loose trash picked up. Containers emptied.
- DI bags on Sunderland changed out. MS4 on Jennifer street to east is in good condtition
-permit signs posted around site

Site is in compliance.
ESC17-01694 Conference3/8/20183/9/20183/9/2018 10:34:15 AMAPASS
10 AM site walk through with RP Dean

All corrections have been completed.
- gutter and sidewalk broom swept.
- loose trash picked up. Containers emptied.
- DI bags on Sunderland changed out. MS4 on Jennifer street to east is in good condtition
-permit signs posted around site

Site is in compliance.
ESC17-00063 General Inspection3/9/20183/9/20183/9/2018 8:27:46 AM CANC