PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, March 9, 2020
.
Number of inspections:
10
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-01167
General Inspection
3/9/2020
3/9/2020
3/10/2020 4:19:50 PM
PASS
No trackout or mud around perimeter. Receiving storm drains have sediment protection. No loose trash observed. Concrete washout pan with stabilized access is on 1st & State.
No corrections requested at this time.
ESC18-01692
General Inspection
3/9/2020
3/9/2020
3/10/2020 3:54:51 PM
CANC
ESC18-01105
Site Final
3/9/2020
3/9/2020
3/10/2020 3:43:16 PM
P
PASS
ESC19-00667
Site Final
3/6/2020
3/9/2020
3/10/2020 3:23:48 PM
P
PASS
Home complete and landscaped. Subdivision BMPs to remain installed for active construction
ESC19-00693
Site Final
3/6/2020
3/9/2020
3/10/2020 3:22:36 PM
P
PASS
Home complete and landscaped. Subdivision BMPs to remain installed for active construction
ESC18-00020
General Inspection
3/9/2020
3/9/2020
3/10/2020 3:13:49 PM
PART
Subdivision BMPs installed. Top section has has stormwater controls installed and is blocked off to prevent dumping and trackout.
Concrete washout facility on Foxgrove. Subdivision storm drains have sediment filter bags installed. Hunter Homes RP Kyle on duty.
No
Corrections request:
- lots of wind blown trash along the sides of Harris North Trailhead/Homestead Trail access. Projects on trapper are complete, request to pick up all visible trash in the rip rap along the lane and the surrouding hillsides. Inspector collected trash from upper Trapper drainage area and placed in back of stormwater pond for pick up
Notified Kyle, he will have crew do it next week.
Follow up scheduled
ESC19-01053
General Inspection
3/5/2020
3/9/2020
3/10/2020 12:03:01 PM
P
PASS
check for water truck/dust controls.
Water truck now staged on site as requested.
No significant trackout. No windblown dust observed. Approved.
ESC19-00160
BMP Violation
3/6/2020
3/9/2020
3/10/2020 11:40:54 AM
A
FAIL
NO activity at site. West phase is disturbed, unstabilized and vacant.
Multiple Violations:
- no maintained BMPs onsite
- dirty/full storm drain inlet bags on Gabrielle
- loose trash strewn all around phase 2 perimeter and on north side of Gabrielle.
- no construction entrance
- no ESC permit sign posted
- no stabilization of disturbed areas and stockpiles
Preparing Notice of Violation to send to RP Tim Neihoff and Sterling Homes.
ESC18-01105
Aging Inspection
3/9/2020
3/9/2020
3/9/2020 1:03:43 PM
CANC
ESC18-01353
Aging Inspection
3/9/2020
3/9/2020
3/9/2020 8:14:16 AM
DEFR