BLD01-00596
| BLD-Final | 3/29/2002 | 4/1/2002 | 4/1/2002 12:00:00 AM | A | NR |
|
|
fn occ allen ###-#### ; complete rails 4/1/2002 10:59:16 AM
|
BLD01-00604
| BLD-Final | 3/29/2002 | 4/1/2002 | 4/1/2002 12:00:00 AM | A | NR |
|
|
fn occ allen###-####
|
BLD00-03627
| BLD-Conference | 4/1/2002 | 4/1/2002 | 4/1/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 4/1/2002 11:46:30 AM w/ bldr re b.e.c., etc. keep c/n
|
BLD01-02565
| BLD-Framing/Rough-in | 4/1/2002 | 4/1/2002 | 4/1/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 4/1/2002 4:40:54 PM shear ok except, chk sh. wall behind f.p. add fireblocks same location, ok to insulate
|
BLD02-00362
| BLD-Footing | 4/1/2002 | 4/1/2002 | 4/1/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 04/01/2002 at 07:58:24. Contact: ###-####. int ftgs,,,complete bar at pads, recall. 4/1/2002 4:49:24 PM
|
BLD02-00299
| BLD-Framing/Rough-in | 4/1/2002 | 4/1/2002 | 4/1/2002 12:00:00 AM | P | FAIL |
|
|
fr insp mike- ###-#### c/n, fnd insul,access, nailing at panels, verify plbg/hvac permits for existing bath remodel 4/1/2002 5:18:16 PM
|
BLD98-03705
| BLD-Conference | 4/1/2002 | 4/1/2002 | 4/1/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 4/1/2002 10:36:03 AM Chuck re c/n...rec'd temp exit plan & crack monitoring as requested; discussed w/ plan chk 4/1/2002 5:16:42 PM
|