PLM02-00813
| Sprinkler (Final) | 3/29/2002 | 4/1/2002 | 4/1/2002 12:00:00 AM | A | PASS |
|
|
backflow behind bld 1137-kevin ###-####--for renissance aparts
|
PLM02-00018
| Final | 3/29/2002 | 4/1/2002 | 4/1/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/29/2002 at 16:57:20. Contact: ###-####.
|
PLM02-00815
| Final | 4/1/2002 | 4/1/2002 | 4/1/2002 12:00:00 AM | P | PASS |
|
|
###-#### EDIS
|
PLM02-00564
| Plumbing Rough-in | 4/1/2002 | 4/1/2002 | 4/1/2002 12:00:00 AM | P | PART |
|
|
mate ###-#### r/i ok to cover wall,s only for 3 sink,s and one mop sink need to change inch and half vent to two inch or revent fixtures contractor exceeded one -third permitted horizontal length as per table 7-5 upc 4/1/2002 3:55:33 PM
|
PLM02-00816
| Plumbing Rough-in | 4/1/2002 | 4/1/2002 | 4/1/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-00583
| Final | 4/1/2002 | 4/1/2002 | 4/1/2002 12:00:00 AM | P | PASS |
|
|
sharon ###-#### fn
|
PLM02-00453
| Final | 4/1/2002 | 4/1/2002 | 4/1/2002 12:00:00 AM | P | PASS |
|
|
###-####
|