BLD00-02459
| BLD-Aging Inspection | 4/1/2003 | 4/1/2003 | 4/1/2003 12:00:00 AM | | DONE |
|
|
Talked with person from contractor company, they will talk with Mark who will get back to me , I have allready talked with him approx 4 weeks ago and have not heard back. 4/7/2003 11:45:09 AM
|
BLD00-02549
| BLD-Aging Inspection | 4/1/2003 | 4/1/2003 | 4/1/2003 12:00:00 AM | | CANC |
|
|
|
BLD02-02047
| BLD-Aging Inspection | 4/1/2003 | 4/1/2003 | 4/1/2003 12:00:00 AM | | CANC |
|
|
|
BLD03-00369
| BLD-Framing/Rough-in | 3/31/2003 | 4/1/2003 | 4/1/2003 12:00:00 AM | A | FAIL |
|
|
FRED--PARTIAL FR; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. c/n given to contractor. 4/1/2003 10:44:20 AM
|
BLD02-01373
| BLD-Conference | 3/31/2003 | 4/1/2003 | 4/1/2003 12:00:00 AM | A | FAIL |
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Annette MooreNo one at site house has been sided with out approval as I still have a correction notice in window new plans were approved which involved window modification hold downs etc I posted a framing do not cover sticker along with a c/n to stop work. Talked with a Jim who will met me on site am . 4/1/2003 11:44:41 AM
|
BLD03-00277
| BLD-Energy code compliance | 3/31/2003 | 4/1/2003 | 4/1/2003 12:00:00 AM | A | PASS |
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD03-00097
| BLD-Framing/Rough-in | 3/31/2003 | 4/1/2003 | 4/1/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 3/31/2003 at 1:55:40 PM. Contact: ###-####.c/n posted . 4/1/2003 5:39:38 PM
|
BLD02-03027
| BLD-Final | 4/1/2003 | 4/1/2003 | 4/1/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/1/2003 at 8:42:08 AM. Contact: ###-####.Ok also special inspection report for bolts epoxie ok. 4/1/2003 5:36:59 PM
|
BLD02-02166
| BLD-Final | 4/1/2003 | 4/1/2003 | 4/1/2003 12:00:00 AM | P | PART |
|
|
rod; Phone #: ###-#### Internet Inspection Request from: Annette Moore. c/n items ok except sink height .and special insp report. 4/1/2003 5:38:17 PM 4/1/2003 5:38:55 PM
|
BLD03-00471
| BLD-Final | 4/1/2003 | 4/1/2003 | 4/1/2003 12:00:00 AM | P | NR |
|
|
LARRY; Phone #: ###-#### Internet Inspection Request from: Darla DownsCalled contractor this needs plumbing also gave a reminder for smoke detectors 4/1/2003 5:40:26 PM
|
BLD02-00921
| BLD-Final | 3/31/2003 | 4/1/2003 | 4/1/2003 12:00:00 AM | P | FAIL |
|
|
ibro; Phone #: ###-#### Internet Inspection Request from: Annette Moore. Needs the handrail fixed and new step exstended out also noted that 1 st inspector had not measured the guardrail height. posted a c/n. This was difficult job as first inspector had only asked them for a hand rail. 4/1/2003 5:42:14 PM
|