BLD04-00044
| BLD-Framing/Rough-in | 3/31/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 3/31/2004 at 2:34:48 PM. Contact: ###-####.
|
MEC04-00811
| Conference | 3/31/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | A | CANC |
|
|
Internet Inspection Request from: Mya Matheson
|
MEC04-00812
| Conference | 3/31/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | A | CANC |
|
|
Internet Inspection Request from: Mya Matheson
|
MEC04-00811
| Rough-in | 3/31/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | A | FAIL |
|
|
3/31/2004 7:51:05 PM c/n posted for insulation sheild drop to sheetrock contact/bath fan connections. 3/31/2004 7:52:04 PM
|
MEC04-00811
| Pressure Test | 3/31/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | A | PASS |
|
|
3/31/2004 7:50:53 PM 3/31/2004 7:51:05 PM 3/31/2004 7:52:16 PM
|
MEC04-00811
| Rough-in | 3/31/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | A | CANC |
|
|
|
MEC04-00812
| Pressure Test | 3/31/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | A | PASS |
|
|
|
MEC04-00812
| Rough-in | 3/31/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | A | FAIL |
|
|
3/31/2004 7:50:53 PM 3/31/2004 7:51:05 PM c/n posted for insulation shield drop to drywall hook up bath fans. 3/31/2004 7:52:45 PM
|
MEC04-00812
| Rough-in | 3/31/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | A | PASS |
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Annette Moore 3/31/2004 9:55:12 PM This was phoned in for a conference by mistake and other permit for mecanical was ready for inspection so I inspected furnace . but no back and fire places ok. 3/31/2004 9:54:08 PMPhone #: ###-#### 3/31/2004 3/31/2004 9:55:36 PM
|
MEC04-00783
| Final | 3/30/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | A | FAIL |
|
|
DENNIS; Phone #: ###-#### Internet Inspection Request from: Darla Downs Posted a c/n. 3/31/2004 8:20:44 PM
|
BLD01-03230
| BLD-Final | 3/31/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 3/31/2004 at 11:51:00 AM. Contact: ###-####. Needs the electrical permit finaled, which is expired, electrical inspector has talked with tri-state electric. Also the tops of the pre-fab walls, hve not been tied off. 4/1/2004 12:28:02 AM
|
MEC04-00834
| Pressure Test | 4/1/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | P | PASS |
|
|
done yesterday 4/1/04. 4/1/2004 5:24:36 PM
|
MEC04-00834
| Rough-in | 3/31/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Richard Reppert
|
MEC04-00835
| Rough-in | 4/1/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | P | FAIL |
|
|
Dixie- As late in afternoon as possible for these 2. Thanks.; Phone #: ###-#### Internet Inspection Request from: Richard Reppertc/n posted on windows insulation shield /bath fan connection. 3/31/2004 9:35:41 PM
|
MEC04-00835
| Pressure Test | 4/1/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Richard Reppert
|
MEC04-00834
| Pressure Test | 4/1/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Richard Reppert c/n posted insulation sheild bath fan connections. 3/31/2004 9:36:21 PM
|
BLD03-02670
| BLD-Energy code compliance | 4/1/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | P | PASS |
|
|
nate; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD03-02498
| BLD-Energy code compliance | 4/1/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | P | FAIL |
|
|
ALAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs posted c/n. 4/1/2004 12:46:19 AM
|
MEC04-00420
| Final | 4/1/2004 | 4/1/2004 | 4/1/2004 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 4/1/2004 at 10:23:46 AM. Contact: ###-####. Out of time I put this in for AM. 4/1/2004 1:07:25 AM
|