Inspections for the day of: Friday, April 1, 2005.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE04-04017 Final3/31/20054/1/20054/1/2005 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 3/31/2005 at 3:44:09 PM. Contact: ###-####. 110.26(F)(1)(b) leak protection shall be provided over panel, 314.25 boxes shall be covered, 408.4,panel schedule shall be correct 4/1/2005 9:49:31 AM
ELE05-01053 Electrical Rough-In3/31/20054/1/20054/1/2005 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 3/31/2005 at 3:46:20 PM. Contact: ###-####. called left message, corrections not made, re-inspection fee due . 300.4 cables parrallel to framing members, 300.10, elect cont. of metal raceways 4/1/2005 7:50:51 AM
ELE05-00698 Final4/1/20054/1/20054/1/2005 12:00:00 AMAPASS
Internet Inspection Request from: Bob Glenn called left message to fix sheet rock by range recpt ok to final 4/1/2005 10:30:21 AM
ELE05-01087 Permanent Service3/31/20054/1/20054/1/2005 12:00:00 AMAPASS
john ###-#### p/s u/g exst ok 4/1/2005 8:11:24 AM
ELE05-00050 Final3/31/20054/1/20054/1/2005 12:00:00 AMANR
Please call Louis with any questions; Phone #: ###-#### Internet Inspection Request from: Kevin Braithwait called contr, way too many missing items to make an inspection. fee due 4/1/2005 8:54:16 AM
ELE04-04102 Conference3/31/20054/1/20054/1/2005 12:00:00 AMADONE
carol-- ###-####- met owner to review room wiring 4/1/2005 10:11:23 AM
ELE05-00652 Final3/31/20054/1/20054/1/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/31/2005 at 3:40:19 PM. Contact: ###-####. ok to final 4/1/2005 1:37:29 PM
ELE05-00885 Final4/1/20054/1/20054/1/2005 12:00:00 AMPFAIL
We would like this job inspected this afternoon, My journeyman will be onsite to give you the tour. Thanks!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell talked with elect, 110.26(A) work space shall be provided around panels. 4/1/2005 5:00:19 PM
ELE05-01074 Temporary Service4/1/20054/1/20054/1/2005 12:00:00 AMPPASS
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moor correction made t/s u/g n ok 4/1/2005 3:51:43 PM
ELE05-01095 Temporary Service4/1/20054/1/20054/1/2005 12:00:00 AMPPASS
###-#### - emmett t/s o/h n ok 4/1/2005 12:52:12 PM
ELE05-01084 Conference4/1/20054/1/20054/1/2005 12:00:00 AMPDONE
call 1st before insp --steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie talked about getting power back on with a same day service change 4/1/2005 5:02:02 PM
ELE05-00981 Temporary Service4/1/20054/1/20054/1/2005 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 4/1/2005 at 11:18:54 AM. called contr left card,250.24(A) need grounded conductor.in meter with phase wires 4/1/2005 3:34:02 PM