ESC09-00025
| Random Inspection | 4/1/2009 | 4/1/2009 | 4/1/2009 4:33:43 PM | P | PASS |
|
|
site in good condition............ds
|
PLM09-00401
| Plumbing Rough-in | 3/31/2009 | 4/1/2009 | 4/1/2009 4:00:05 PM | P | FAIL |
|
|
Brandon- call 30 mins prior to going for access Phone #: ###-#### need to install backwater valve.......ds
|
PLM06-01946
| Plumbing Rough-in | 3/31/2009 | 4/1/2009 | 4/1/2009 2:54:15 PM | P | CANC |
|
|
Naomi- 4pm if possible Phone #: ###-#### called and cancelled...........ds
|
PLM09-00276
| Final | 3/31/2009 | 4/1/2009 | 4/1/2009 1:21:04 PM | A | PASS |
|
|
JOB CONTACT IS MIKE WEBB Phone #: ###-#### Internet Inspection Request from: ADAM WARR
|
PLM09-00437
| Plumbing Rough-in | 3/31/2009 | 4/1/2009 | 4/1/2009 11:24:24 AM | A | PART |
|
|
tim Phone #: ###-#### need to install t/sh valve........ds
|
PLM08-00041
| Other | 4/1/2009 | 4/1/2009 | 4/1/2009 11:00:37 AM | A | PASS |
|
|
Conference on installing 2" dcva on bld. service.............Has more electrical work and needs to move panel to install dcva..work to be done within a couple of months......ds
|
PLM09-00442
| Sprinkler (Final) | 3/31/2009 | 4/1/2009 | 4/1/2009 10:45:01 AM | A | PART |
|
|
This is a Sprinkler Take-Off/Backflow Preventer inspection, thank you. Phone #: ###-#### Internet Inspection Request from: michael addis dcva not tested .....ok to backfill........ds
|
PLM09-00397
| Water and/or Sewer | 3/31/2009 | 4/1/2009 | 4/1/2009 9:58:23 AM | A | CANC |
|
|
|
PLM09-00397
| Final | 4/1/2009 | 4/1/2009 | 4/1/2009 9:58:14 AM | A | PASS |
|
|
|
PLM09-00390
| Plumbing Rough-in | 4/1/2009 | 4/1/2009 | 4/1/2009 9:10:52 AM | A | CANC |
|
|
larry
|
PLM09-00390
| Other | 4/1/2009 | 4/1/2009 | 4/1/2009 9:10:41 AM | A | PASS |
|
|
larry................conference only..........ds
|