ELE10-00657
| Final | 4/1/2010 | 4/1/2010 | 4/1/2010 4:17:36 PM | P | PASS |
|
|
call first Inspection requested from web by: PAT MILLER Phone #: ###-#### ok to final, no esc this project
|
ELE10-00653
| Electrical Rough-In | 4/1/2010 | 4/1/2010 | 4/1/2010 3:51:18 PM | P | PASS |
|
|
Inspection requested from web by: Zane Robertson Phone #: ###-#### corrections made, ric ok
|
ELE10-00601
| Electrical Rough-In | 3/31/2010 | 4/1/2010 | 4/1/2010 3:50:09 PM | P | PART |
|
|
Chad Phone #: ###-#### gave ok to insulate studs where nm passes thru, will call for rest of ri later, no esc this project
|
ELE10-00594
| Permanent Service | 4/1/2010 | 4/1/2010 | 4/1/2010 2:32:29 PM | P | PASS |
|
|
p/s u/g n ok
|
ELE10-00666
| Electrical Rough-In | 4/1/2010 | 4/1/2010 | 4/1/2010 2:24:54 PM | P | PASS |
|
|
John-PLease call at least 30 mins prior to inspection Phone #: ###-#### ric ok, no esc this project
|
ELE10-00634
| Final | 4/1/2010 | 4/1/2010 | 4/1/2010 1:36:05 PM | P | NH |
|
|
ready Inspection requested from web by: gary batten Phone #: ###-#### called, told electrician that somebody needs to give access and to call back in, no esc this project
|
ELE10-00589
| Permanent Service | 3/31/2010 | 4/1/2010 | 4/1/2010 12:39:45 PM | P | PASS |
|
|
Please contact Jake for any additional information. Inspection requested from web by: Tina Payne Phone #: ###-#### p/s u/g n ok, no esc this project
|
ELE10-00665
| Rough-In Permanent Service | 4/1/2010 | 4/1/2010 | 4/1/2010 12:17:23 PM | P | PASS |
|
|
Inspection requested from web by: Rowdy Monroe Phone #: ###-#### ric ok, p/s u/g n ok
|
ELE08-01186
| ELE-Aging Inspection | 3/31/2010 | 4/1/2010 | 4/1/2010 12:01:52 PM | A | DONE |
|
|
looked at part of job, called contractor, he doesn't want to finish job because owner not paying contractors, observed open breaker openings in panel, no labelling at service, closet light violation, open ground in receptacle, mbr has open buried outlet, entry requires outlets, jetted tub requires access, lot of painting going on, so no access to kitchen area
|
GCE10-00030
| GCE-Final | 3/31/2010 | 4/1/2010 | 4/1/2010 10:24:13 AM | A | PASS |
|
|
(Mandatory Inspection) Scope of inspection: Customer called in inspection for wiring on new heater pump. You may contact Andy @ ###-#### for any questions. ok to final
|
ELE10-00590
| Final | 3/31/2010 | 4/1/2010 | 4/1/2010 9:45:54 AM | A | PASS |
|
|
job is accessible. Inspection requested from web by: John Edwards Phone #: ###-#### corrections made, ok tro final, no esc this project
|
ELE10-00374
| Electrical Rough-In | 4/1/2010 | 4/1/2010 | 4/1/2010 9:25:19 AM | A | PASS |
|
|
Ceiling inspection. Contact is Brian Cornell. Inspection requested from web by: Richard Montgomery Phone #: ###-#### ok to cover ceilings
|
ELE10-00373
| Electrical Rough-In | 4/1/2010 | 4/1/2010 | 4/1/2010 9:23:59 AM | A | PASS |
|
|
Ceiling inspection. Contact is Brian Cornell. Inspection requested from web by: Richard Montgomery Phone #: ###-#### ok to cover ceilings
|
ELE10-00653
| Rough-In Permanent Service | 3/30/2010 | 4/1/2010 | 4/1/2010 8:38:20 AM | A | CANC |
|
|
Inspection requested from web by: Zane Robertson Phone #: ###-#### see ri and p/s
|
ELE10-00653
| Permanent Service | 4/1/2010 | 4/1/2010 | 4/1/2010 8:29:01 AM | A | PASS |
|
|
Inspection requested from web by: Zane Robertson Phone #: ###-#### p/s u/g n ok
|
ELE10-00653
| Electrical Rough-In | 4/1/2010 | 4/1/2010 | 4/1/2010 8:28:19 AM | A | FAIL |
|
|
Inspection requested from web by: Zane Robertson Phone #: ###-#### called, left message, left correction notice, NEC 300.4(A) edge of bored holes shall be 1 1/4" from edge of framing members, BCC shall provide approved set of plans on job, shall provide boxes for termination points for nm cable
|
ELE10-00449
| Final | 3/31/2010 | 4/1/2010 | 4/1/2010 8:16:36 AM | A | PASS |
|
|
per structural request ok to final, no esc this project
|